Similar Projects
Furnish Beaver Lake Nature Center Windows and Doors Replacement
Alteration
Bidding
Baldwinsville, NY 13027

Hangar Door Test and Evaluation
Post-Bid
Syracuse, NY

NYS Fair Grounds Replace Doors at Various Buildings
Post-Bid
Syracuse, NY 13209

Z-- Repair Failing Doors
Results
$100,000 to $250,000 est. value
Syracuse, NY 13210

Inspection & Repair Hangar Doors
Results
Fort Drum, Syracuse, NY 13601

Furnish Gypsum Wallboard and Metal Framing as Specified
Term Contract
Post-Bid
NY

Acoustical Tile
Term Contract
Results
Syracuse, NY 13202

Installation / Replacement Of Decoration / Privacy Film For Store Fronts At Forty-Five (45) LNA Service Stations
Alteration
Post-Bid

County of Onondaga Department of Transportation Interior Wall Installation
Results
East Syracuse, NY 13057

Hangar Doors Repair
Alteration
Post-Bid
Mattydale, Watertown, NY 13211

Maintenance and Repair of Overhead and Roll-Up Doors As Specified
Term Contract
Results
Syracuse, NY 13202

UH Interfaith Chapel Doors
Alteration
Post-Bid
Syracuse, NY 13210

J065--Automatic Door Maintenance 528A7
Results
Syracuse, NY 13210

Furnish Gypsum Wallboard and Metal Framing as Specified
Term Contract
Post-Bid
NY

Onondaga County DOT Interior Wall Installation Project
Results
East Syracuse, Syracuse, NY 13057

Last Updated 12/16/2021 10:51 AM
Project Title

UH 4B and CH 5W - B.H. Door and Toilet Replacement

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13210   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: is to include all necessary labor, material and equipment for the replacements on the behavioral health units at Downtown and Community Campus. At the downtown 4B location we will replace the patient room and patient toilet room doors and hardware to reduce ligature risks. At both the Downtown 4B and Community 5W location we will be replacing all toilets with OMH approved fixtures. This work will also include patching and finishing in these areas per the documents. This work will take place on occupied behavioral health units.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents