Similar Projects
Water System Improvements
Bidding
$702,399 est. value
Lowndesboro, AL

Rehabilitation and Repainting of the R.J. Chandler WTP Elevated Water Storage Tank and Johnson City Elevated Water Storage Tank
Infrastructure, Alteration
Bidding
Selma, AL

Contract 2 - 200,000 Gallon Elevated Steel Water Storage Tank (Red Springs Tank)
Post-Bid
Gilbertown, AL

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Hueytown Water Tank Repair and Painting
Results
Less than $684,625 est. value
Bessemer, AL

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Three Mile Creek Severe Weather Attenuation Tanks
Construction
Less than $17,207,000 est. value
Mobile, AL

Agrarian Center Improvements Project
Post-Bid
Montgomery, AL 36100

Rock Mountain Tank Improvements
Results
Less than $531,915 est. value
Hueytown, AL 35023

CR 3 Water Tank Improvements Project
Post-Bid
Millport, AL 35576

Raintree Tank Refurbishment
Results
Huntsville, AL 35801

New 200,000 Gallon Elevated Water Storage Tank on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,020,000 est. value
Brewton, AL 36426

Elevated Water Storage Tank
Results
Less than $960,000 est. value
Ozark, AL 36363

2020 Mulberry Painting and Repairs for Sites 2 and 3 Raw Water Tanks
Post-Bid
Birmingham, AL 35222

Contract No. 1 - Rehabilitation of Three Water Storage Tanks
Results
Less than $620,000 est. value
Collinsville, AL

Last Updated 06/01/2021 09:31 AM
Project Title

Water System Improvement Project

Physical Address View project details and contacts
City, State (County) Pinckard, AL   (Dale County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $514,825
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of painting and rehabilitating two multi-column steel water storage tanks in 100,000 and 150,000 gallon capacities. The project also consists of installing approximately 530 radio read meters and necessary appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents