Similar Projects
Corrugated Aluminum Pipe
Bidding
Fayetteville, NC 28306

Corporation Drive Outfall
Infrastructure
Bidding
NC

Crown Coliseum Swale Repair
Infrastructure
Post-Bid
Fayetteville, NC

22-08-SW Linear Park Drain Line Repair
Infrastructure
Post-Bid
Fayetteville, NC 28301

Drainage Assistance Project Iverleigh Circle and Rolling Hill Road
Results
Fayetteville, NC 28302

Carnsmore Drainage Improvements
Results
Fayetteville, NC 28304

Aluminum Box Culvert and Headwalls
Infrastructure
Bidding
Fayetteville, NC 28306

LEC Storm Drainage Control
Infrastructure
Post-Bid
Fayetteville, NC 28301

Aluminum Box Culvert with Headwalls
Results
Fayetteville, NC 28301

DAP Project - Paisley Avenue
Infrastructure
Bidding
Fayetteville, NC 28304

Headwall
Results
Fayetteville, NC 28301

Reinforced Concrete Pipe
Term Contract
Results
Fayetteville, NC 28302

Drainage Assistance Program 502 Argyll Road
Results
Fayetteville, NC 28301

Headwall
Results
Fayetteville, NC 28301

Big Rockfish Creek Outfall - Contract 1
Results
Less than $7,895,205 est. value
Fayetteville, NC 28302

Last Updated 02/07/2022 12:05 PM
Project Title

EWP DSR 5038-503 Green Street Stream Bank Stabilization/ Wall Design

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at 230 green street in Fayetteville, Nc. The project involves The installation of stream bank stabilization structures and partial Reconstruction of the existing beaver law parking lot. Approximately 0.5 acres of land will be disturbed for the construction of the stream bank stabilization and parking lot reconstruction within the limits of construction shown on the Plans. All disturbed areas will be sodded or otherwise stabilized as indicated on The drawings. Erosion control measures will be placed within the limits of construction at strategic locations to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents