Similar Projects
Solar Farm Proposed - Asotin County
New Construction
Conception
$1,000,000 to $5,000,000 est. value
Clarkston, WA

Snyder Creek Remediation at Packwood Lake Hydroelectric Project
Renovation
Post-Bid
$500,000 est. value
Richland, WA

Chief Joseph Dam Station Service Refurbishment - Turbines & Generators
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Bridgeport, WA 98813

The Goldendale Energy Storage - Columbia River Gorge
New Construction
Design
$2,400,000,000 est. value
Goldendale, WA 98620

Jackson Powerhouse Tenant Improvements
Renovation - 3,000 SF
Results
$2,000,000 est. value
Sultan, WA

CDJ Powerhouse Fall Protection
Renovation
Results
$100,000 to $250,000 est. value
Bridgeport, WA

Generator Rewinds
Renovation, Alteration
Design
$100,000,000 to $250,000,000 est. value
Bridgeport, WA 98813

Pole and Attach Cable and Transformer
Renovation
Design
$75,000 est. value
Mountlake Terrace, WA 98043

Reported 07/20/2022 01:33 PM
Project Title

Transformer and Switchgear Replacement for a Substation

Physical Address View project details and contacts
City, State (County) Everett, WA 98204   (Snohomish County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and renovation of a power facility in Everett, Washington. Working plans call for the renovation of a power facility; and for site work for a power facility. PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Public Utility District No. 1 of Snohomish has declared that an emergency exists and waived competitive bidding requirements to select a contractor to perform the following work: o District crews will conduct a transformer and switchgear replacement for a Substation at 11501 Harbour Point Blvd, Mukilteo, WA. If you desire further information concerning this work, please call: 425-783-4315 or toll free 1-877-783-1000, within the State of Washington.

Details

Power Plant, Renovation.
Division 33 - Utilities, Utility Transformers, High-Voltage Switchgear and Protection Devices.
Division 48 - Electrical Power Generation, Electrical Power Control Equipment, Electrical Power Generation Transformers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents