Similar Projects
Waterford Montessori Academy - Request for Proposals: HVAC Improvements
Renovation
Bidding
Waterford Township, MI 48329

Phase 3 HVAC Upgrades Project
Post-Bid
West Bloomfield, MI

BP4 District Wide Temperature Controls
Term Contract
Post-Bid
Southfield, MI 48075

Vehicle Exhaust Removal System
Results
Auburn Hills, MI

Preferred Campus Wide Dryer Vent and Forced Air Furnace Cleaning Services
Term Contract
Results
Rochester, MI

CDBG Mobile Home Furnace Replacement
Term Contract
Post-Bid
Rochester Hills, MI

Springfield Oaks HVAC
Results
Davisburg, MI 48350

Air Duct Cleaning at City of Pontiac Buildings
Post-Bid
Pontiac, MI

HVAC Maintenance Service Contract
Term Contract
Results
Novi, MI 48375

New Walk-In Freezer at Power Middle School
Post-Bid
Farmington, MI 48335

Bid Pack 15 Boiler and Chiller Replacement
Results
Farmington, MI 48335

HVAC Professional Services
Term Contract
Post-Bid
Auburn Hills, MI 48326

2020 HVAC Maintenance/ Professional Services Contract
Term Contract
Results
MI

Kettering High School Classroom AC and Mott High School Chiller Replacement
Post-Bid
Waterford Township, MI 48329

2020 HVAC Rooftop Unit 6 Replacement- City Hall
Results
Wixom, MI

Last Updated 08/05/2021 11:40 AM
Project Title

Kitchen Cooler/Freezer Condenser Replacement

Physical Address View project details and contacts
City, State (County) Clawson, MI   (Oakland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents