Similar Projects
Poudre Learning Center-Hall133, Riparian Restoration
Renovation
Design
Greeley, CO 80631

Little Thompson River Trail Project
Post-Bid
Johnstown, CO 80534

Parking Lot Maintenance 2020
Post-Bid
Less than $100,000 est. value
Greeley, CO 80639

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

Ash Street Improvements
Results
Hudson, CO 80642

Basalite Plant
New Construction - 200,000 SF
Construction
$10,000,000 est. value
Fort Lupton, CO 80621

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Great Western Trail Improvements
Post-Bid
Windsor, CO 80550

65th Avenue Road Widening Project
Results
Greeley, CO 80631

Bella Vista
New Construction
Post-Bid
Lochbuie, CO

Saint Acacius Subdivision Site Development
New Construction
Results
Mead, CO

WCR23/Great Western Trail Pedestrian Connection - Design and Consultation Service
Post-Bid
Severance, CO

Construction Manager for Milliken Path Improvements
Results
Milliken, CO 80543

Centennial Trail Improvement
Post-Bid
Kersey, CO

2020 Concrete Maintenance Services
Term Contract
Results
$150,000 to $200,000 est. value
Erie, CO 80516

Last Updated 10/03/2020 04:46 AM
Project Title

Clerk and Recorder Building Site Work

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of fencing and concrete at the Clerk and Recorder building located at 1250 H Street, Greeley, CO. It will include the over excavation of the parking area and replacement of deficient subgrade materials. Concrete channels, sidewalks and parking areas will be re-poured and stripped. Colored concrete will be placed in certain areas. 1. Remove concrete per plans. 2. Remove chain link fencing per plans. 3. Remove basketball goal posts per plans. 4. Remove all asphalt at front entry drive per plans. 5. Over excavate parking area as shown and replace removed material with new suitable material at parking area as shown on plans and described in soils report. 6. Install new drainage channel, sidewalk and parking lot paving as shown on plans. 7. Provide sidewalk chases and bollards as shown. 8. Contractor shall always maintain access to either the front of the building or the back of the building. 9. All fencing materials, goal posts and concrete must be properly disposed of offsite. 10. Contractor shall provide builders risk insurance in the amount of the bid. 11. Finish grade site after fence, concrete and asphalt are removed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents