Similar Projects
Vincent Road Ground Storage Tank - Lafayette Consolidated Government
Infrastructure
Conception
$1,500,000 CJ est. value
Lafayette, LA 70508

Painting and Repairing 500,000-gallon Elevated Water Tank
Renovation, Infrastructure
Bidding
$692,555 CJ est. value
Jeanerette, LA 70544

Ground Storage Tank Replacement, Miller and Cleo Road Sites
Infrastructure
Bidding
$500,000 CJ est. value
Monroe, LA 71201

Concordia Waterworks Elevated Tank Improvements
Infrastructure
Post-Bid
Ferriday, LA

Port Improvements to Elevated Water Storage Tank Repairs
Infrastructure
Post-Bid
$240,000 est. value
Lake Charles, LA

Install Aboveground Storage Tank (AST)
Term Contract
Results
$25,000 to $100,000 est. value
Baton Rouge, LA 70801

DEQ Underground Storage Tank Closures
Infrastructure
Results
Baton Rouge, LA

Contract B Elevated Water Tank LA40 West for Tangipahoa Water District
Renovation, Infrastructure
Bidding
$1,910,000 CJ est. value
Hammond, LA 70401

David Drive Water Storage Tank Rehabilitation
Infrastructure
Post-Bid
Metairie, LA 70005

Cathodic Protection Survey
Term Contract
Results
Barksdale AFB, LA 71110

Contract A New Water Well LA40 West for Tangipahoa Water District
Infrastructure
Bidding
$1,950,000 CJ est. value
Hammond, LA 70401

Aboveground Storage Tank Repair - LDWF
Infrastructure
Post-Bid
$50,000 est. value
Grand Chenier, LA 70643

Repairs to Potable Water Storage Tanks
Infrastructure
Results
Angola, LA 70712

Start Water System, Inc.
Term Contract
Post-Bid
Start, LA 71279

Water Storage Tanks Rehabilitation
Infrastructure
Results
Sulphur, LA

Last Updated 10/18/2022 06:06 PM
Project Title

Fabacher Ground Storage Tank Painting - City of Lafayette

Physical Address View project details and contacts
City, State (County) Lafayette, LA 70501   (Lafayette County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of October 18, 2022, this project is currently in the Proposed FY 2022 - 2027 CIP and funding is allotted for FY 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents