Similar Projects
The Oaks
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oklahoma City, OK 73131

The Oaks
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oklahoma City, OK 73131

Origin Hotel
New Construction
Design
Oklahoma City, OK

Heritage Parking Garage
Addition
Design
$5,500,000 est. value
Oklahoma City, OK 73102

Residential, Local and Collector Street Resurfacing Unit Price Contract
Infrastructure
Bidding
$8,000,000 CJ est. value
Oklahoma City, OK 73102

Residential, Local and Collector Street Resurfacing Unit Price Contract
Infrastructure
Bidding
$8,000,000 CJ est. value
Oklahoma City, OK 73102

The Silos
New Construction - 419,019 SF
Post-Bid
$10,000,000 CJ est. value
Edmond, OK 73003

RFP D/B - Design Build, Construct SICU and Renovate Operating Rooms
Demolition, Renovation, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Oklahoma City, OK 73104

Triple X Roadway Construction
Infrastructure
Results
$1,406,497 est. value
OK

Grade, Drain, Surface, and Bridge
Infrastructure
Results
OK

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

Puppy Paws Hotel & Spa / OKC
New Construction - 9,975 SF
Construction
$2,000,000 est. value
Edmond, OK 73013

Woody Creek East
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Edmond, OK 73034

New City Hall Building - City of Edmond
Demolition, New Construction, Infrastructure - 65,000 SF
Pending Verification
$32,600,000 CJ est. value
Edmond, OK 73034

North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Last Updated 09/11/2023 05:13 PM
Project Title

Towneplace Suites by Marriott / Oklahoma City

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73102   (Oklahoma County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 11, 2023, this project is in planning. No development applications or building permits have been submitted into the City of Oklahoma City. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

7 Stories Above Grade, 161,764 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents