Similar Projects
2021 Six-Inch (6”) Trailer Mounted Centrifugal Trash Pump Purchase
Bidding
Mount Pleasant, MI

Pump Station Maintenance Program
Bidding
Southfield, MI

Water Well and Yard Hydrant Installation
Post-Bid
Rochester, MI 48306

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Filter Media Removal and Replacement
Results
Less than $32,925 est. value
MI

Hillview Wellhouse Improvements
Results
White Lake, MI

Municipal Water Supply Well Drilling
Post-Bid
Cadillac, MI

NGI Gate Replacement and Pump Addition
Results
Clinton Township, MI

Swimming Pool Pump Assembly Replacement
Post-Bid
Livonia, MI

WWTP Secondary Effluent Pump Rebuild
Results
Less than $28,590 est. value
Ann Arbor, MI

3" Trash Pump
Post-Bid
Beverly Hills, MI

Observation Wells and Test/Production Well
Results
Less than $80,000 est. value
Vicksburg, MI

Test Well Number 8
Post-Bid
Flint, MI 48505

Chapaton Ps Dry Weather Pump and Screen Improvements
Results
Clinton Township, MI

Vault Pumping Services for North Higgins Lake State Park and various locations administered by North Higgins Lake State Park
Post-Bid
Roscommon, MI

Last Updated 02/09/2021 08:55 AM
Project Title

Wastewater Treatment Plant West Screw Pump Replacement

Physical Address View project details and contacts
City, State (County) Big Rapids, MI   (Mecosta County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents