Similar Projects
Carpet Cleaning, Repair and Flood Restoration Services
Term Contract
Post-Bid
Arlington, TX 76019

Sun Valley Detention Pond
Post-Bid
Fort Worth, TX

Capp Smith Park Lake Retaining Walls 2019
Results
$550,000 est. value
Watauga, TX 76148

Upper Clear Fork Drainage Basin Interceptor Improvements
Results
Fort Worth, TX

Peach Elementary School Retaining Wall
Post-Bid
Arlington, TX 76006

Fort Worth Zoo Creek Drainage Improvements
Results
Less than $2,075,293 est. value
Fort Worth, TX

Washington Drive Erosion Improvements
Post-Bid
$4,900,000 est. value
Arlington, TX 76010

EWP - Storm Debris Removal - Calhoun County Drainage District 11 - Calhoun County, TX
Results

Pond Maintenance
Post-Bid
Fort Worth, TX 76177

Cleaning and Reshaping Ditches
Results
Less than $314,406 est. value
TX

Northeast Courthouse Retaining Wall Addition
Post-Bid
Fort Worth, TX 76054

Eagle Mountain Lake Drainage Basin
Results
Fort Worth, TX

Colleyville John McCain Road at Westcoat Drive Intersection Improvements
Post-Bid
Colleyville, TX 76034

2500 Block Austin Road Drainage Improvements in Richland Hills
Results
$60,000 est. value
Richland Hills, TX 76118

Brook Hollow Park Channel Improvements Phase 1-Sulphur Branch
Results
TX

Last Updated 02/04/2019 11:54 AM
Project Title

Upper Big Fossil Creek Drainage Basin Relief Interceptor

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The major work will consist of the (approximate) following: 1. 330 LF 54" Sewer Pipe by Other Than Open Cut. 2. 469 LF 54" Sewer Pipe. 3. 3,728 LF of 48" Sewer Pipe by Other than Open Cut. 4. 4,154 LF 48" Sewer Pipe. 5. 415 LF 27" Sewer Pipe. 6. 1,900 LF of 27" sanitary sewer rehabilitation. 7. 6,242 LF of 24" sanitary sewer rehabilitation.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents