Similar Projects
Challenge Course Rebuild at Riverfront Park
Bidding
Tampa, FL

Athletic Goals, Poles, Posts, and Racks Purchase, Removal, and Installation
Bidding
FL

Design-Build Services for Parks and Recreation Master Plan
Post-Bid
Less than $400,000 est. value
Tampa, FL 33602

One Time Purchase of Bleachers for Sgt. Smith Middle School
Post-Bid
Carrollwood, FL 33625

Newsom High School Construction of ROTC Obstacle Course Construction
Results
Less than $100,000 est. value
Lithia, FL 33547

Construction Services Hyde Park at Morrison Street
Results
Tampa, FL 33602

Park Amenities
Post-Bid
Less than $1,014,099 est. value
Tampa, FL 33601

Bleacher and Backboard Inspection and Repair
Results
Less than $230,000 est. value
Tampa, FL 33601

Dog Park Pedestrian Bridge and Site Improvements
Post-Bid
Less than $221,635 est. value
Plant City, FL 33563

Macfarlane Park Freedom Playground Expansion
Results
Less than $358,700 est. value
Tampa, FL 33602

Artificial Turf Fall Surfacing System at Carrollwood Elementary (K-3 Playground)
Term Contract
Post-Bid
Carrollwood, FL 33618

New Batting Cages
Results
$78,500 est. value
Plant City, FL 33563

Parks and Recreation Department New Tampa Community Park Inclusive Playground Design-Build
Post-Bid
Less than $1,600,000 est. value
Tampa, FL

Playground Safety Services - Synthetic Rubber
Term Contract
Results
Less than $400,000 est. value
Tampa, FL 33601

Park Structures
Post-Bid
$6,844,663 est. value
FL

Reported 10/30/2020 12:00 AM
Project Title

McIntosh Park Trails Phase I Project

Physical Address View project details and contacts
City, State (County) Plant City, FL 33565   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

McIntosh Park for passive recreation in a natural setting. The McIntosh Park Trails Phase I Project is a project to improve passive recreational opportunities at the site through the addition of approximately 2.3 miles of compacted aggregate trails, a compacted aggregate parking lot, miscellaneous park amenities (benches, trash cans, and a message board), and an elevated steel observation tower

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents