Similar Projects
Last Updated | 04/20/2023 09:41 AM |
Project Title | CRC Mechanical Room Leak Mitigation |
Physical Address | View project details and contacts |
City, State (County) | Olympia, WA 98505 (Thurston County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $35,800 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 20 2023, the project has been awarded. A timeline for construction has not been confirmed. SCOPE OF WORK: Install waterproof floor coating in mechanical room. Install steel angle dams around pipes that penetrate floor slab and floor opening at stair. Drill holes in raised rim of existing floor drain to allow for better drainage. Install new drip pans under mechanical equipment. Install 3-way light switch. ESTIMATED BASE BID COST RANGE: $30,000 to $40,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Voluntary numerical MWBE goals of 10% MBE and 8% WBE have been established for this project. Achievement of the goals is encouraged. However no minimum level of MWBE participation shall be required as a condition of contract award. Bids will not be rejected or considered nonresponsive ifthey do not include MWBE participation. Please direct questions regarding this project to the office of the Consultant. 24 hours following bid opening, bid results will be available by e-mailing The Evergreen State College Public Records Request Office at publicrecords@ evergreen.edu and requesting a copy of the results The state reserves the right to accept or reject any or all proposals and waive informalities *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |