Similar Projects
Last Updated | 07/01/2020 10:41 AM |
Project Title | Caja Del Rio Landfill Phase 3 Landfill Gas (LFG) Collection System Expansion at Santa Fe Solid Waste Management Agency |
Physical Address | View project details and contacts |
City, State (County) | Santa Fe, NM 87506 (Santa Fe County) |
Category(s) | Environmental |
Sub-Category(s) | Landfill |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Architect/Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Drilling and completion of vertical LFG extraction wells and installation of 2-inch wellheads. Installation of below-grade LFG header and lateral piping, including connection to vertical LFG extraction wells and existing lateral/header piping. Installation of a condensate management system, including installation of condensate forcemain and air supply line and connection to existing condensate management piping. Add alternates which may be required as a result of existing site conditions at the time of construction or selected at the discretion of the Owner include the following: Road crossings and trenching in excess of 5-feet in depth. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |