Similar Projects
Facilities HVAC Integrated Preventative Maintenance Services
Bidding
Jacksonville, FL 32212

Farm Worker Village HVAC Installation
Bidding
Immokalee, FL 34142

Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

A.Q. Jones Center HVAC Replacement - Buildings 1-3
Post-Bid
Gainesville, FL 32601

Remove and Replace Existing Air Handling Units 1 and 2 at Hardee Senior High School Building 1300
Results
Wauchula, FL 33873

Remove and Replace Existing Split System Units at Bowling Green Elementary School Cafeteria
Results
$189,147 est. value
Bowling Green, FL 33834

Kitchen Exhaust System Cleaning
Term Contract
Bidding
FL

H--FY20: Annual Service for Boiler Testing
Post-Bid
Lake City, FL

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

Sebring and Avon Park Middle School Gymnasium A/C
Bidding
Avon Park, Sebring, FL 33870

Halifax Health T-Zone Air Handling Unit Replacement
Post-Bid
Daytona Beach, FL 32100

Bay County Sheriff's Office Jail HVAC Test, Adjust, and Balance Services
Results
Panama City, FL 32404

Taylor County Jail Chiller Replacement
Post-Bid
Perry, FL 32347

HVAC Chiller Repair, Maintenance and Installation of New Equipment
Term Contract
Results
Sarasota, FL 34230

BPS Longleaf Elementary School Chiller
Post-Bid
Melbourne, FL 32935

Last Updated 02/18/2021 03:14 AM
Project Title

Rooftop Unit (RTU) Replacement

Physical Address View project details and contacts
City, State (County) State-Wide: FL
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace an existing rooftop unitary DX HVAC unit on an existing roof. The existing duct smoke detectors will be removed and reinstalled as required to support the mechanical scope. A new duct smoke detector will be added. B. This project involves the expansion of an existing system. Of primary importance are: 1. Notification coverage shall not be affected. 2. Manual initiation devices shall not be affected. 3. Automatic initiation devices shall be modified and added as required by Code.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents