Similar Projects
Bridge and Debris Removal and Disposal
Demolition, Infrastructure
Bidding
$944,000 est. value
Bismarck, ND

Bridge Replacement and Incidentals
Post-Bid
ND

Bridge Structures
Post-Bid
ND

Structure Repairs
Results

Structure Repairs
Results

West Bridge Replacements
Renovation, Infrastructure
Post-Bid
$2,500,000 est. value
Watford City, ND

Structure Replacements and Incidentals
Results
$1,000,001 to $1,500,000 est. value

Mouse River Enhanced Flood Protection Phase SA-1 Sawyer - County Road 23 Bridge Replacement
Renovation, Infrastructure
Post-Bid
Sawyer, ND

Bridge Deck Overlay, Curb and Deck Repair
Results
$400,001 to $600,000 est. value
ND

Bridge Removal
Renovation, Infrastructure
Post-Bid
$300,000 est. value
ND

Structure Replacement, Grading, and Realignment
Results
$1,000,001 to $1,500,000 est. value
Mayville, ND

Structure Replacement, Grading, Gravel Surfacing
Renovation
Post-Bid
$800,001 to $1,000,000 est. value
Fullerton, ND

Structure Replacement and Median X-Overs
Results
$2,000,001 to $2,500,000 est. value
ND

Bridge Replacement Structure
New Construction, Infrastructure
Post-Bid
$490,000 est. value
Mandan, ND

Structure Replacement, Minor Grading and Incidentals
New Construction
Results
$600,001 to $800,000 est. value
ND

Reported 06/15/2022 06:35 PM
Project Title

Anne Street Bridge Rehabilitation - E16 - City of Minot

Physical Address View project details and contacts
City, State (County) Minot, ND 58701   (Ward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $1,868,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a bridge / tunnel in Minot, North Dakota. Conceptual plans call for site work for a bridge / tunnel. The Anne Street Bridge is a pedestrian bridge that connects downtown to the north side of the Mouse River. The bridge spans BNSF rail yard and the Mouse River. A 2019 study concluded that the bridge must be closed for safety reasons and provided a structural analysis and cost estimate to perform the repairs. A consultant will be needed to design and administer the construction project. As of June 14, 2022, this project is still in the conceptual stage. Bidding is anticipated to take place in 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents