Similar Projects
Z1da--(Const) Replace Fan Coil Units 539-21-109
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cincinnati, OH 45220

Replace Ozone Depleting Equipment
Renovation, Alteration
Bidding
Cincinnati, OH 45220

HVAC and Mechanical Products
Term Contract
Post-Bid

Annual Full Service Maintenance of York Chillers at City Hall
Post-Bid
Cincinnati, OH

Miscellaneous HVAC Repairs for GCWW Non-Administrative Facilities
Results
Cincinnati, OH 45202

Fire Station 23 Roof and HVAC Roof Top Unit Replacement
Results
Cincinnati, OH 45206

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Maintenance and Repair Services
Results
Less than $90,000 est. value
Cincinnati, OH 45214

HVAC & Facility Systems, Automation, Installation, Service and Related Products & Services in Ohio
Term Contract
Post-Bid

Misc. HVAC Repair Services for Treatment and Sewer Infrastructure
Results
Cincinnati, OH 45202

HVAC Preventative Maintenance (PM) and Repair
Results
Less than $1,074,881 est. value
Cincinnati, OH 45214

Portable Hepa Particulate Air Filtration Systems
Results
Cincinnati, OH 45202

HVAC Unit Replacement
Results
Cincinnati, OH 45243

UC Turner, Morgens & Scioto It Closets HVAC Modification
Results
$673,000 est. value
Cincinnati, OH 45221

UC Vontz Center Lab Exhaust Fans Replacement
Results
$490,000 est. value
Cincinnati, OH 45219

Last Updated 01/12/2022 11:41 AM
Project Title

HVAC Installation

Physical Address View project details and contacts
City, State (County) Harrison, OH   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of HVAC model SAUAB75 7.5 ton unit with a 7.5 ton odyssey condensing unit and 3000 CFM AHU, demo and removal of old unit, remove existing zoning controls, provide and install (8) new zoning controls, provide and install new AHU controls for new unit. Provide and install new sensors, stats, hot water valve, damper actuators, low temp detector, CO2 sensor, OA sensor, and new VFD. Provide (1) new F4 controller with display. Install heating hot water piping and duct to AHU-3 and all necessary refrigerant piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents