Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Planning Services
Post-Bid
Lake Orion, MI

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Engineering Services - Consulting, Design and Construction Engineering
Term Contract
Post-Bid
Wixom, MI

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Consultant Services for Water and Sanitary Sewer Rate Study
Infrastructure
Post-Bid
Bloomfield, MI

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Consulting Services for Upper Long Lake - Lake Board East Coli Study
Infrastructure
Post-Bid
Bloomfield, MI

Environmental Sampling, Assessment, and Analytical Services
Results

As Needed Engineering Services
Term Contract
Post-Bid
Waterford, MI

Last Updated 10/05/2022 09:36 AM
Project Title

RFP Engineering - Architectural and Engineering Services - OaklandUniversity West Campus

Physical Address View project details and contacts
City, State (County) Auburn Hills, MI 48326   (Oakland County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 5, 2022. Project is cancelled, No anticipated date for re-bid. Deadline for written questions July 26, 2022 at 12:00 pm Questions: All written questions and/or requests for clarification regarding this RFP must be submitted to Purchasing contact as indicated above. An addendum will be issued responding to questions and will be posted to the website for review and acknowledgement. During the period provided for in the preparation of proposals, or at any time thereafter, the University may issue addenda or amendments to this RFP. These addenda will be numbered consecutively and will be posted to the website. All responses to this RFP should be prepared with full consideration of the acknowledged addenda and must include Schedule A. The scope of services includes, but is not limited to, site and landscape design, building and systems design, construction documentation, bidding support, and construction administration. The selected firm will work under the direction of the Facilities Management Capital Planning and Design Department and will work closely with Campus Engineering, Environmental Health and Safety, and other appropriate campus entities and committees. Oakland University is acquiring an existing higher education building located in Auburn Hills, Michigan for use as a classroom building. The university seeks to address deferred maintenance, reconfigure rooms as needed, bring the kitchen facility online and update the finishes in the facility. At approximately 141,000 square feet over two stories, the building includes an older portion constructed and renovated in phases beginning in the 1980s, and a newer portion construction in the mid 2000s. Existing building documentation has been provided as an attachment to this RFP. The documents are to be used for reference only and any information contained in them must be verified by the architect. The overall project budget is $10,000,000 which includes all project related costs including, but not limited to, soft costs, permit costs, FF&E, moving, technology, security and low voltage. The construction cost is estimated to be $6,000,000. The total project cost and construction cost might be increased as the scope is defined based on the proposed academic programs by Oakland University. Oakland University intends to select an architectural design and engineering services firm for renovating the existing property. The firm shall collaborate with the construction management (CM) firm, yet to be determined, throughout the project. Construction is expected to commence in fall 2022 and building occupancy will be for fall semester 2023. A portion of the building will be occupied in the fall and winter semesters of the 2022-2023 academic year therefore this project will require phased construction. The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents