Similar Projects
Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Surface Treatment
Infrastructure
Results

Water Storage Tank - City of Fort Pierre
New Construction, Infrastructure
Conception
$1,760,000 CJ est. value
Fort Pierre, SD 57532

RFP Construction Manager at Risk - Stanley County School District Multi-Purpose Building Project
New Construction, Infrastructure
Bidding
$350,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Asphalt Surface Treatment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Pierre, SD 57532

2023 Crack Sealing and Joint Sealing
Infrastructure
Bidding
$300,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Mill & Overlay
Infrastructure
Post-Bid
Fort Pierre, SD

Last Updated 03/07/2023 03:32 AM
Project Title

Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $10,947,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD1806 - Fm US14 to the end of State Jurisdiction near Mission Ridge As of March 07, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents