Similar Projects
Mid-Block Crossing U City
Infrastructure
Conception
$1,000,000 CJ est. value
Philadelphia, PA 19104

Mid-Block Crossing U City
Infrastructure
Conception
$1,000,000 CJ est. value
Philadelphia, PA 19104

Byberry North Business Center
New Construction, Infrastructure - 656,904 SF
Design
$320,000,000 CJ est. value
Philadelphia, PA 19116

Conshohocken Avenue Mixed-Use Residential Development
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Philadelphia, PA 19131

Navy Yard Street Maintenance
Infrastructure
Post-Bid
Philadelphia, PA 19112

2022 Milling in the 2nd and 3rd Highway Districts
Infrastructure
Post-Bid
$3,000,000 to $4,000,000 est. value
Philadelphia, PA

PAMT Emergency Sinkhole Repairs
Infrastructure
Results
$1,030,000 est. value
Philadelphia, PA 19148

Annual Service Contract for Street Paving and Related Work for the Restoration of Water Department Excavations and Main Breaks
Term Contract
Results
$1,000,000 to $2,000,000 est. value
Philadelphia, PA

Crown 95 Logistics Center / Philadelphia
New Construction, Infrastructure - 381,200 SF
Construction
$205,000,000 CJ est. value
Philadelphia, PA 19134

Crown 95 Logistics Center / Philadelphia
New Construction, Infrastructure - 381,200 SF
Construction
$205,000,000 CJ est. value
Philadelphia, PA 19134

Spruce Street Mixed-Use Development
New Construction, Infrastructure - 149,500 SF
Pending Verification
$75,000,000 CJ est. value
Philadelphia, PA 19139

Wheatsheaf Lane Distribution Center / Philadelphia
Demolition, New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Philadelphia, PA 19137

Youthbuild Philadelphia Charter School
Renovation - 36,000 SF
Conception
Philadelphia, PA 19132

W Berks Street Mixed-Use
New Construction, Infrastructure - 7,272 SF
Design
$60,000,000 CJ est. value
Philadelphia, PA 19122

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Last Updated 04/11/2023 09:02 AM
Project Title

St. Joseph's Preparatory School Renovation - Phase 2

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19130   (Philadelphia County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vocational School
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a renovation of an existing private school. Phase 1 which renovated Villiger Hall will be completed in October 2022. Phase 2 will include classroom and faculty office renovations and a refurbish of all athletic facilities including its indoor track, weight room, locker room and field house floor. As of April 10, 2023, all subcontract trades have been let and set. Building permit has been issued. A firm construction timeline has not been set, however, construction is expected to begin spring 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents