Similar Projects
Holden Elementary Building Upgrades
Renovation
Bidding
$700,000 CJ est. value
Holden, MO 64040

Plumbing Services - Major Projects (Rebid)
Term Contract
Sub-Bidding
Independence, MO 64050

Plumbing Projects
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Louis, MO 63103

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

City of Republic Aquatic Center Filtration System Repair
Renovation
Sub-Bidding
$80,000 CJ est. value
Republic, MO 65738

At-Risk Construction Management Services
Term Contract
Post-Bid
Blue Springs, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Last Updated 03/27/2023 10:34 AM
Project Title

Southpoint Ground Storage Tank

Physical Address View project details and contacts
City, State (County) Washington, MO 63090   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,002,119 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes construction of a new 1,000,000 gallon elevated water storage tank including foundations, tank erection, interior piping, tank painting, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom The Scope of Work includes the installation of approximately 70 lineal feet of 12" diameter ductile iron pipe, 60 lineal feet of 8" diameter SDR 21 Class 200 PVC Pipe, restraints, hydrants, fittings, general sitework and grading, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders The City of Washington anticipates awarding the project in March 2023. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962," (P.L. 87-581: 76 Stat. 357) and implementing regulations. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a tenhour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The City of Washington hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. THE OWNER INTENDS TO AWARD THE CONTRACT TO THE MOST RESPONSIVE, RESPONSIBLE BIDDER SUBMITTING THE LOWEST BID. THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, AND TO WAIVE ANY IRREGULARITIES IN THE BEST INTEREST OF THE OWNER

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents