Description |
Summer 1/Phase 1 – June 20, 2022 – August 22, 2022: renovate existing main office & counseling center, seismic upgrades, renovate existing cafeterias & existing wood shop, 1st floor ceiling work, select flooring, select roofing to existing roof, coordinate with SKSD abatement contractor.
Summer 1 Thru Summer 2/Phase 2 – June 20, 2022 – August 21, 2023: Convert 4 classrooms to 2 nd floor science rooms and art room. New wood shop.
Summer 2/Phase 3 – June 19, 2023 – August 21, 2023: - Gym and stage floor, stage curtain replacement, convert 2 classrooms into science room, renovate foods lab, demo pool and pool house, site work, exterior cleaning and painting, complete any remaining roofing at select existing roof areas. |
Details |
Elementary School, Renovation.
Division 03 - | Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection. | Division 08 - | Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware. | Division 09 - | Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting. | Division 10 - | Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles. | Division 11 - | Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures. | Division 12 - | Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture. | Division 21 - | Fire Suppression. | Division 22 - | Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods. | Division 25 - | Integrated Automation. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting. | Division 27 - | Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems. | Division 28 - | Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm. | Division 31 - | Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment. | Division 32 - | Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. |
|