Similar Projects
HCA Acute Care Hospital
New Construction, Infrastructure
Conception
$41,900,000 CJ est. value
Wildwood, FL 32163

Freedom Fellowship Church Expansion
New Construction, Infrastructure - 19,000 SF
Conception
$6,200,000 CJ est. value
Wildwood, FL 34785

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Millennium Park - Phase 1 & 2
Infrastructure, Renovation
Bidding
$11,000,000 CJ est. value
Wildwood, FL 34785

Sumter County Wayfinding Signs Phase III
Infrastructure
Bidding
$300,000 CJ est. value
Bushnell, FL 33513

Extended Stay America / Wildwood
New Construction, Infrastructure - 50,160 SF
Sub-Bidding
$10,000,000 CJ est. value
Wildwood, FL 34785

C-466 at C-475N Roundabout Safety Project - Sumter County
Infrastructure
Post-Bid
$500,000 CJ est. value
Wildwood, FL 34785

Chitty Chatty Utility Crossing
Infrastructure
Post-Bid
$463,612 CJ est. value
Wildwood, FL 34785

Directional Bores
Infrastructure
Results
Bushnell, FL

Asphalt Cut and Patch
Infrastructure
Results
The Villages, FL 32162

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Eden Villages
New Construction, Infrastructure
Construction
$36,800,000 CJ est. value
Wildwood, FL 34785

Livano Wildwood
New Construction, Infrastructure - 6,142 SF
Pending Verification
$95,000,000 CJ est. value
Oxford, FL 34484

Woodspring Suites / Oxford
New Construction, Infrastructure - 51,945 SF
Pending Verification
$15,700,000 CJ est. value
Oxford, FL 34484

Last Updated 07/08/2023 04:07 AM
Project Title

Continental Country Club WWTF Lift Station - SR 44 Force Main

Physical Address View project details and contacts
City, State (County) Wildwood, FL 34785   (Sumter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,434,899 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All bids shall be prepared using the Project Manual and Drawings. Addenda will be sent via e-mail to all documented plan holders up to seventy-two (72) hours before the Bid closing time. The Owner/Engineer is not responsible for delivery of addenda to prospective bidders. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Construction of new Master Lift Station adjacent to existing Continental Country Club WWTF and construction of approximately 9,400 LF of 8" PVC force main from the current proposed Lift Station northeast through the spray field located east of Continental Boulevard and South of County Road 44. Construction of approximately 9,600 linear feet of 8" PVC force main starting just east of Continental Boulevard and travelling west along the south side of County Road 44. CONTRACT TIME: Construction time to achieve Substantial Completion is 180 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 210 consecutive calendar days. All bids shall be prepared using the Project Manual and Drawings. Addenda will be sent via e-mail to all documented plan holders up to seventy-two (72) hours before the Bid closing time. The Owner/Engineer is not responsible for delivery of addenda to prospective bidders. BID SECURITY: A 5% bid security is required for this project, to be submitted with bids. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. engineer's estimate of cost for the Project - $3,744,681.75 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 05/25/2023

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents