Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Parking Lot/loading Zone
Infrastructure
Bidding
$1,000,000 CJ est. value
Green River, UT 84525

Construction of the Castle Dale North Chip Seal Project 2022
Infrastructure
Post-Bid
Castle Dale, UT 84513

Construction of the CVSSD - City Street Project 2022
Infrastructure
Post-Bid
Castle Dale, UT

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Farmington Bay Dyke-Line Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Orangeville, UT 84537

Castle Dale City Bike Trail Project 2023
Infrastructure
Results
$199,879 CJ est. value
Castle Dale, UT 84513

Applecross Station Visitor Center
Infrastructure
Post-Bid
$60,000 CJ est. value
Orangeville, UT 84537

Zion Mountain Local Service District - Applecross Station Visitor Center General Contractor - Main Building
New Construction, Infrastructure
Post-Bid
$170,000 CJ est. value
Orangeville, UT 84537

Last Updated 03/17/2023 11:06 AM
Project Title

Construction of the CVSSD(Castle Valley Special Service District) - City Street Project 2023

Physical Address View project details and contacts
City, State (County) Castle Dale, UT 84513   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ADVERTISEMENT FOR BIDS NOTICE TO CONTRACTORS Project Owner: CASTLE VALLEY SPECIAL SERVICE DISTRICT P.O. Box 877 Castle Dale, Utah 84513 Separate sealed BIDS for the construction of the CVSSD - City Street Project 2023 will be received by Castle Valley Special Service District at the office of Castle Valley Special Service District at 20 South 100 East – PO Box 877 – Castle Dale, Utah 84513 until 2:00 p.m., March 16, 2023, and then opened and publicly read aloud. A bid bond in the amount of five percent (5%) of the bid, made payable to the Owner, shall accompany the Bid. Major items of work: 1. Hot Mix Asphalt (HMA) - 164,130 S.F. 2. Untreated Base Course (1” Minus) - 197,644 S.F. 3. Granular Borrow - 197,644 C.Y. The Owner reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the District. Prospective bidders shall assemble at the office of Castle Valley Special Service District, March 9, 2023, at 10:00 a.m., for the group showing. Attendance at the project pre-site-show meeting and site-show is mandatory and a prerequisite to submitting a bid for the project. Bidding Contractors, or a duly authorized representative, must arrive at the District's office for the said meeting and site-showing, Castle Valley Special Service District, 20 South 100 East, Castle Dale, Utah. The CONTRACT DOCUMENTS may be examined at the following location: Engineer's Office: Johansen & Tuttle Engineering, Inc., 90 South 100 East - Castle Dale, Utah 84513. Contract documents may be obtained at the Pre-bid meeting upon a non-refundable fee of $100.00. The fee will provide both a hard copy and electronic copy of the project drawings and specifications. March 1, 2023 Brad Giles - Chairman Date CVSSD Published in the ETV Newspaper March 1, March 8 and March 15, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents