Similar Projects
T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

The Coronet At 21st
New Construction, Infrastructure - 2,587 SF
Design
$4,200,000 CJ est. value
Harrisburg, PA 17101

Home2Suites Hotel / Swatara Township
New Construction, Infrastructure - 64,878 SF
Design
$8,000,000 CJ est. value
Swatara, PA 17111

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Eshelman Street, George, Concord, and Poplar Alleys (2020/2021 CDBG) Project
Infrastructure
Results
Highspire, PA 17034

Front Street Interceptor Rehabilitation - Phase 2
Infrastructure
Results
$15,742,837 CJ est. value
Harrisburg, PA 17110

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

Eisenhower Boulevard Flexible Space Building
New Construction, Infrastructure - 78,000 SF
Pending Verification
$8,000,000 CJ est. value
Middletown, PA 17057

I-83 South Bridge Project
Demolition, New Construction, Infrastructure
Pending Verification
$650,000,000 CJ est. value
Hummelstown, PA 17036

Fairville Avenue over I-81
Infrastructure, Renovation
Conception
$2,725,000 CJ est. value
Hummelstown, PA 17036

Eisenhower Interchange
Infrastructure
Design
$158,200,000 CJ est. value
Swatara, PA 17111

Bethel Village
New Construction, Infrastructure - 46,784 SF
Post-Bid
$12,000,000 CJ est. value
Harrisburg, PA 17102

Last Updated 08/27/2023 02:31 PM
Project Title

I-83 East Shore Section 3

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17104   (Dauphin County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $154,667,126 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Sr 0083 Section 079 Project Extends on I-83 From the 19th Street (Sr 3007) Interchange to 29th Street (Sr 3013) and Consists of the Widening and Reconstruction of an Existing 24 Foot Cement Concrete and Bituminous Roadway, Consisting of New Superpave Pavement 36 Feet in Width and Full Depth Paved Shoulders, 24 Foot Collector Distributor Roadways, Accel/decel Lanes, Ramps and Sideroads, Upgrade to the 19th Street (Sr 3007) Partial Interchange and One New Full Interchange at Cameron Street (Sr 0230), and Removal of One Existing Full Interchange at 13th Street. Roadway and Structure Improvements Are Included on Cameron Street (Sr 0230), 19th Street (Sr 3007) and 29th Street (Sr 3013). Also Included Are: Embankment Benching and Sliver Fills, Replacement of a One-span Bridge and a Two-span Bridge With a Proposed Three-span Bridge, Replacement of a Two-span Bridge With a Proposed One-span Bridge, Replacement of a One-span Bridge With a Proposed Two-span Bridge, Removal of a Three-span Bridge and Replacement With Embankment, Removal of Portions of Existing Bridges, Five Proposed Retaining Walls, One Proposed Retaining Wall With Structure Mounted Sound Barrier, Two Proposed Ground Mounted Sound Barriers, Two Proposed Moment Slabs With Toe Walls, Four Proposed Overhead Sign Structures, Guiderail, Drainage, Pollinator Garden, Highway Lighting, Pavement Markings, and Other Miscellaneous Construction, All Contained Within an Overall Project Length of 9,950.00 Linear Feet (1.884 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 0083, Section 079, in Dauphin County, City of Harrisburg, Swatara Township, Paxtang Borough, From a Point 800 Feet West of the Cameron Street Underpass at Segment 0424/0425 Offset 0974/0974 to the 29th Street Overpass at Segment 0444/0445 Offset 1432/1406. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 26.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-83 East Shore Section 3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents