Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Southern Region Disaster Recovery Support BPA
Results

2020 Milling and Deep Patching
Results
Less than $1,405,250 est. value
Monroe, GA 30655

2020 CDBG Pecan Road Paving and Drainage Improvements Project
Results
Loganville, GA 30052

South Madison Avenue Resurfacing
Results
Less than $350,000 est. value
Monroe, GA 30655

Piedmont Parkway Extension
Results
Monroe, GA 30655

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

C S Floyd Paving Project
Results
Loganville, GA 30052

2021 LMIG Project
Results
Mount Vernon, GA

2021 Milling and Deep Patching
Results
Monroe, GA

6.322 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 74 Beginning West of SR 7 and Extending East of SR 42
Results
Monroe, GA

12.503 Miles Of Milling, Inlay And Plant Mix Resurfacing
Infrastructure
Results

Last Updated 12/17/2021 09:35 AM
Project Title

FY 2020 CDBG Storm Drainage and Street Improvements

Physical Address View project details and contacts
City, State (County) Monroe, GA   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include storm drainage and road improvements through installation of 24" curb and gutter, milling of existing asphalt, aspalt paving, removal of existing driveway pipes, installation of concrete headwalls, installation of 18", 24", 30", 36" RCP and 18", 24", 30", 36" HDPE Storm Drainage Pipe.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents