Similar Projects
SWR - Circuits 12-592, 12-593, 12-594, 12-595, 115-122 and 115-165; Transmission and Distribution Line Clearance
Alteration
Bidding
$299,000 est. value
Everett, WA

RFQ Contractor - Prequalification of Electrical Line Contractors - 2023
Term Contract
Sub-Bidding
Everett, WA 98201

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Fire Station 65 Generator and HVAC Replacement
Alteration
Post-Bid
Stanwood, WA 98292

Woods Creek - Circuits 12-1808 & 12-1811 - Distribution and Transmission Line Clearance
Infrastructure
Results
$900,000 est. value
Monroe, WA 98272

115Kv Transmission Steel Poles and Caissons for North Stanwood Camano Island Project
Infrastructure
Results
Stanwood, WA 98292

Lift Station No.4 Generator Replacement
Alteration
Post-Bid
$330,000 est. value
Mill Creek, WA 98012

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Mountlake Terrace Lighting Fixtures Upgrade
Alteration
Post-Bid
Mountlake Terrace, WA 98043

Transmission and Distribution Line Clearance
Alteration
Results
$150,000 est. value

Portable Classroom Infrastructure
Alteration
Post-Bid
Lake Stevens, WA

13.8kV Metal-Clad Switchgear Harbour Pointe Substation
Alteration
Results
WA

Energy Services Program Engagement and Management Solution
Alteration
Post-Bid
Everett, WA

Electric Building Breaker Retrofit
Alteration
Results
$260,000 est. value
Everett, WA 98201

SWR - Lynnwood - Circuits 12-274, 12-4867, 12-725, 12-726, 12-727 - Distribution and Transmission Line Clearance
Alteration
Post-Bid
$300,000 est. value
Lynnwood, WA

Last Updated 07/22/2022 12:01 AM
Project Title

Water Filter Plant (WFP) Emergency Generator Replacement

Physical Address View project details and contacts
City, State (County) Monroe, WA 98272   (Snohomish County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $4,874,905 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

** This project has been awarded to IMCO General Construction, Inc. in the amount of $4,874,905. ** Proposed work includes, but is not limited to, removal of two existing generators and associated appurtenances, partial demolition and reconstruction of buildings housing the generators, installation of two new generators, fucl tanks, fuel delivery systems, electrical infrastructure, and generator synching and control infrastructure, and generator system testing, commissioning, and utility synching coordination. The genevators, fuel tank, and electrical synching and control equipment will be provided by the City of Everett. A Bid received from a Bidder who did not attend one pre-bid meeting and sign the sign-in sheet will be found not responsible and the bid will be rejected. The engineers estimate for this Project is approximately $2,506,600, not including sales tax. All bids must be made upon the City forms provided for this purpose and must be accompamed by a bid bond or certified check. or cashiers check in an amount not less than five percent (5%) of the total amount of the Bid, all as set forth in the Contract Documents. One hundred percent (100%) Payment and Performance Bonds will be required of the successful Bidder to guarantee faithful performance of the contract. Any questions and/or auswers that may affect the bid will be included in an addendum to the bid documents and sent to all the plan holders. The City reserves the right to reject any and all bids and to Waive any irregularities or informalhties. No Bidder may withdraw its Bid after the hour set for the opening thereof, except as may be provided in the Contract Documents. The City further reserves the right to make the bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for a period of forty five (45) days after bid opening. The Contractor will be required to comply with all local, State, and Federal laws and regulations

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents