Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

HVAC Improvements -Leetonia Facility
Alteration
Bidding
$150,000 est. value
Leetonia, OH 44431

Campus Steam System Repairs 2022
Alteration
Bidding
$365,000 est. value
Athens, OH 45701

Repairs of Heating, Plumbing, AC and Mechanical Systems for 2021, 2022 and 2023
Post-Bid
Lima, OH

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Recreation Center - Lobby and Gym HVAC Modifications
Results
Less than $210,000 est. value
Cleveland, OH 44115

Heat Pump Replacement - Independence Square
Alteration
Bidding
Wellsville, OH

HVAC and Mechanical Products
Term Contract
Post-Bid

District Wide HVAC Building Automation System Upgrades (1589)
Results
$473,209 est. value
Cleveland, OH 44115

Great Oaks Project Number 2020.01.062 Live Oaks Campus Renovation and Addition Pre-Purchase of Air Handling Units
Post-Bid
Less than $2,300,000 est. value
Milford, OH 45150

Wolstein Cooling Tower Repair Phase 1
Results
Cleveland, OH 44115

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

Infrastructure Upgrades to ECU Plant - Chiller 4 Replacement
Results
Less than $369,500 est. value
Cincinnati, OH

Chiller Replacement
Post-Bid
Barnesville, OH 43713

Last Updated 01/21/2022 09:15 AM
Project Title

Municipal Building HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Ontario, OH   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $755,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical Contract $600,000 Bid Alternate 1 $75,000 Bid Alternate 2 $80,000 Replacing antiquated HVAC systems and controls. The HVAC systems will be replaced with new equipment of similar capacities compared to the existing equipment. Equipment replaced will include seven (7) indoor fan coil units and associated outdoor condensing units, and perimeter finned tube heating water control valves. A new natural gas service will be installed for the addition of a new emergency generator.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents