Similar Projects
Animas High School
New Construction
Conception
$21,000,000 est. value
Durango, CO 81301

Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

RDAB Block Remodel/Renovation CMGC
Renovation
Bidding
$4,500,000 est. value
Englewood, CO 80110

Standley Lake High School Renovation and Addition
Renovation, Addition
Bidding
$5,000,000 to $6,000,000 est. value
Westminster, CO 80021

Vestibule Remodel
Post-Bid
Black Hawk, CO

2019 Juniper School Renovation
Post-Bid
Durango, CO 81301

Design/Build of New Greeley West High School
New Construction, Demolition
Results
$123,000,000 est. value
Greeley, CO 80631

Notice Concerning Prequalification for Large Construction Projects
New Construction
Results
$100,000 est. value
Lakewood, CO 80215

Aspen View Academy
New Construction, Addition - 21,000 SF
Construction
$2,000,000 to $2,500,000 est. value
Castle Rock, CO

New Centennial High School and Pueblo East HS
New Construction
Construction
$75,700,000 est. value
Pueblo, CO 81008

September School at Saddle Creek Subdivision
Renovation
Pending Verification
Boulder, CO 80302

New Sierra Grande Pk-12 Replacement Facility
New Construction - 176,700 SF
Post-Bid
$42,554,341 est. value
Blanca, CO 81123

Construction Management/General Contracting Services - New East High School
Results
$75,700,000 est. value
Pueblo, CO 81001

CM/GC Services for 2021 Renovations at Three Sites
Renovation
Construction
Colorado Springs, Thornton, CO

On-Call Contractor / Service Provider - Small Construction - Pre Qualification
Term Contract
Post-Bid
Denver, CO 80204

Last Updated 06/23/2021 12:51 PM
Project Title

Reimagining Montbello

Physical Address View project details and contacts
City, State (County) Denver, CO 80239   (Denver County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $88,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CM/GC firm for preconstruction and construction services for a new comprehensive high school on an existing 30 acre site at 5000 Crown Blvd, Denver, Colorado. Based on community led discussions, Denver Public Schools intends to provide either a replacement high school, combined middle/high school, or a major renovation for the Montbello Campus. A new building will include a 1:1 replacement of program spaces to include the auditorium and regional competition swimming pool. The existing academic programs must remain functional during construction. With the possibility of site constraints, the existing school may be demolished in phases as new construction is ready but must remain operational throughout construction.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents