Similar Projects
Construction of a New Compound Semiconductor Laboratory and Microelectronics Integration Facility on the MIT Ll Campus at Hanscom Air Force Base
New Construction - 162,000 SF
Design
$100,000,000 to $250,000,000 est. value
Lexington, MA

Innovation Center
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Westford, MA 01886

Industry Day for MIT Lincoln Laboratory
Post-Bid
$1,000,000 to $10,000,000 est. value
Lexington, MA 01730

Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for Multi-Discipline Architect-Engineer (A-E) Design and Related Services in Support of Projects Primarily in the NAVFAC SE AOR
Post-Bid
$20,000,000 to $45,000,000 est. value

Architect/Engineer Services for Nationwide Air Force Reserve Projects, and Other Military Projects Primarily within the Great Lakes and Ohio River Division Mission Boundaries
Results
$3,000,000 to $50,000,000 est. value

US Army Soldier Systems Center (NSSC)Natick: Design-Build for Family Housing Replacement
Results
$15,000,000 to $20,000,000 est. value
Natick, MA 01760

Bristol-Myers Squibb
Build-Out - 208,000 SF
Construction
$87,407,530 est. value
Cambridge, MA 02138

Hayden Avenue Office and Parking Garage
New Construction - 566,107 SF
Construction
$14,100,000 est. value
Lexington, MA 02421

Burlington BioCenter
Renovation - 109,500 SF
Pending Verification
Burlington, MA 01803

ElevateBio Base Camp
Renovation - 108,000 SF
Pending Verification
Waltham, MA 02451

Construction of a New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF) for MIT Lincoln Laboratory (MIT Ll) Located at Hanscom Air Force Base (HAFB) in Lexington, Massachusetts
- 35,000 SF
Design
$100,000,000 to $250,000,000 est. value
Bedford, MA 01731

Construction of Human Engineering Laboratory, Natick Soldier Systems Center, Natick, MA
New Construction
Post-Bid
$40,000,000 to $50,000,000 est. value
Natick, MA

Steam Maker Space and Lab - Filed Sub Bids
Results
$1,200,000 est. value
Cambridge, MA

Life Science Complex
New Construction, Renovation - 107,350 SF
Construction
$9,572,000 est. value
Framingham, MA 01701

Cambridge Crossing (CX)
New Construction - 2,500,000 SF
Pending Verification
$10,000,000 CJ est. value
Cambridge, MA 02141

Last Updated 07/01/2019 11:20 AM
Project Title

Alewife Research Center (The ARC)

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02139   (Middlesex County)
Category(s) Green Building, Laboratory
Sub-Category(s) Laboratory, LEED Certified
Contracting Method
Project Status Construction Commenced February 2017, Construction Complete as of third quarter 2018
Bids Due View project details and contacts
Estimated Value $160,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Laboratory, 3 to 4 Stories Above Grade, 224,252 SF New Construction, LEED Certified.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications.
Division 32 - Exterior Improvements.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents