Project Title | Bloomer - Cornell, North Junction STH 40 to CTH E; Bloomer - Bruce, 13th Avenue to East Junction STH 64 |
Physical Address | View project details and contacts |
City, State (County) | Bloomer, Cornell, WI (Chippewa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Signs, Beam Guard, Pavement Marking, and Culvert Replacements. Excavation Common, 2,450 CY; Base Aggregate Dense, 10,500 Ton; Marking Epoxy, 36,600 LF; Construction Staking, 39,810 LF; Construction Staking, 8 Each; Construction Staking, 2 LS; Culvert Pipe, 130 LF 15”, 150 LF 24“; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 62 LF 14” X 23”; Concrete Curb and Gutter, 810 LF; Concrete Sidewalk, 646 SF; Beam Guard, 1,189 LF; Beam Guard Energy Absorbing Terminals, 9 Each; Asphaltic Surface, 675 Ton; HMA Pavement, 33,450 Ton; Removing Asphaltic Surface Milling, 36,150 SY; Tack Coat, 9,650 Gals; Signs, 21 SF. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |