Similar Projects
Last Updated | 02/02/2023 03:49 PM |
Project Title | Roof Project, Phase 2 Middleton Hall Kentucky School for the Deaf |
Physical Address | View project details and contacts |
City, State (County) | Danville, KY 40422 (Boyle County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $350,067 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of roof replacement of Low Sloped Roofs & Metal Roof PVC flute fill and overlay. 1. Low Slope: Remove existing roof system, down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, and cover board insulation. Provide crickets where indicated. 2. Metal Roof: Remove existing gutters. Install new flute fill insulation and cover board, Install PVC Membrane roof system with mechanical heat induction attachment & new gutters and downspouts. 3. Masonry: Repointing (150SF) and seal (1,200 SF) at parapet walls. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |