Similar Projects
Parks - BL Blue Licks Pioneer Museum Roof Replace - East
Renovation
Sub-Bidding
$438,000 CJ est. value
Carlisle, KY 40311

KY State Penitentiary Hospital Reroof
Renovation
Sub-Bidding
$643,637 CJ est. value
Eddyville, KY 42038

Beaver Creek Elementary School Re-Roof
Alteration
Post-Bid
Topmost, KY 41862

Courthouse TPO Roof
Alteration
Post-Bid
Whitley City, KY 42653

Repair Roofing Buildings 1 and 1A
Results
$2,000,000 to $5,000,000 est. value
Lexington, KY 40502

Greysbranch Elementary School Roof Replacement
Alteration
Results
Greenup, KY 41144

Toombs Court and Latimer Heights Roof Replacement
Renovation
Construction
$390,000 CJ est. value
Danville, KY 40422

Maintenance Garage Roof
Alteration
Post-Bid
Frankfort, KY 40601

Municipal Building Reroof
Alteration
Results
Fort Mitchell, KY

Refurbish the Portal 31 Exhibition Mine Tour Area
Infrastructure, Alteration
Post-Bid
Harlan, KY

Calloway County Public Library
Renovation, Addition
Results
Murray, KY 42071

Replace Roofs BLDGs 8 and 21
Alteration
Post-Bid
$250,000 to $500,000 est. value
Louisville, KY 40206

Roof Replacement 2 Historic Buildings
Term Contract
Results
$25,000 to $50,000 est. value
Mammoth Cave, KY 42259

County Clerk Roof
Alteration
Post-Bid
Stanford, KY 40484

UKHC PAV H - Replace AHU S1 and S1A - BP-02 Trades - Trade Package 5 - Fire Suppression
New Construction, Infrastructure
Results
Lexington, KY 40508

Last Updated 02/02/2023 03:49 PM
Project Title

Roof Project, Phase 2 Middleton Hall Kentucky School for the Deaf

Physical Address View project details and contacts
City, State (County) Danville, KY 40422   (Boyle County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $350,067 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of roof replacement of Low Sloped Roofs & Metal Roof PVC flute fill and overlay. 1. Low Slope: Remove existing roof system, down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, and cover board insulation. Provide crickets where indicated. 2. Metal Roof: Remove existing gutters. Install new flute fill insulation and cover board, Install PVC Membrane roof system with mechanical heat induction attachment & new gutters and downspouts. 3. Masonry: Repointing (150SF) and seal (1,200 SF) at parapet walls.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents