Similar Projects
Waco Boats Manufacturing Plant
Addition
Conception
Little Rock, AR 72206

Rock Hill Foods Packaging and Distribution Facility
New Construction - 67,178 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Siloam Springs, AR 72761

Chandler Equipment Expansion
Addition - 26,273 SF
Design
Springdale, AR 72762

Preformed Line Products
Addition - 82,884 SF
Pending Verification
Rogers, AR 72758

US Steel - Northeast Arkansas
New Construction
Pending Verification
$3,000,000,000 est. value
Osceola, AR

Tractor Supply Distribution Facility
New Construction - 900,000 SF
Design
$90,000,000 to $100,000,000 est. value
Maumelle, AR 72113

FedEx Ground Distribution Center
New Construction - 318,000 SF
Pending Verification
$29,000,000 est. value
Jonesboro, AR 72401

Simmons Foods
Addition - 65,000 SF
Design
$100,000,000 est. value
Van Buren, AR 72956

Simmons Foods Processing Facility And Storage Yard
Addition
Pending Verification
Siloam Springs, AR 72761

Hostess Bakery Manufacturing and Distribution Center
Renovation - 330,000 SF
Design
$120,000,000 to $140,000,000 est. value
Arkadelphia, AR

MoistureShield Plant
Addition
Pending Verification
Springdale, AR 72764

Marshalltown Tools
Addition - 48,000 SF
Pending Verification
Fayetteville, AR 72701

Synthesia Technology Manufacturing Facility
New Construction
Pending Verification
$30,000,000 est. value
Little Rock, AR 72206

Slackwater Harbor North Industrial Building
New Construction
Pending Verification
Little Rock, AR

Slackwater Harbor South Industrial Building
New Construction
Pending Verification
Little Rock, AR 72206

Last Updated 06/07/2022 09:36 AM
Project Title

PotlatchDeltic Sawmilll

Physical Address View project details and contacts
City, State (County) Waldo, AR 71770   (Columbia County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Design-Build.
Project Status Design Development, Construction Completion Expected December 2024
Bids Due View project details and contacts
Estimated Value $131,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will increase the mill’s annual capacity from 190 million board feet of dimensional lumber to approximately 275 million board feet / upgrades to the log yard and planer, a new saw line, and a new continuous dry kiln.

Details

Manufacturing/Processing Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents