Similar Projects
Hardy School Roof Replacement - Town of Arlington
Renovation
Conception
$315,000 est. value
Arlington, MA 02474

Dallin School Roof Top EMS Upgrades Boilers - Town of Arlington
Renovation
Conception
$400,000 est. value
Arlington, MA 02476

Florence Roche Elementary School
New Construction - 109,855 SF
Design
$61,500,000 est. value
Groton, MA 01450

St Benedict Classical Academy New Building
New Construction
Design
$8,000,000 est. value
Natick, MA 01760

David Mindess Elementary School Project - Filed Sub Bids
New Construction - 104,885 SF
Post-Bid
$68,300,000 est. value
Ashland, MA 01721

Green Meadow Elementary School Project Management
Renovation
Post-Bid
$25,000,000 to $60,000,000 est. value
Maynard, MA 01754

Lowell Elementary School - Filed Sub Bids
Renovation, Addition - 94,100 SF
Results
$36,000,000 est. value
Watertown, MA 02472

Lowell Elementary School - General Bids
Renovation, Addition - 94,100 SF
Results
$36,000,000 est. value
Watertown, MA 02472

RFQ Contractor - Florence Roche Elementary School
Renovation
Construction
$61,500,000 CJ est. value
Groton, MA 01450

Peirce School Roof Top EMS Upgrades Boilers - Town of Arlington
Renovation
Conception
$600,000 est. value
Arlington, MA 02474

Brophy Locker Room Project
Renovation
Post-Bid
Framingham, MA 01701

Wayland Elementary Schools Student Storage
New Construction
Results
$150,000 est. value
Wayland, MA

Bartlett Boiler Room Stair and Vault Replacement - 2023-14 - City of Lowell
Renovation
Conception
$350,000 CJ est. value
Lowell, MA 01854

Brophy Locker Room - Sub Bid
Renovation
Post-Bid
Framingham, MA 01701

Cambridgeport Elementary School Accelerated Repair Program Window Replacement
Renovation
Results
Cambridge, MA 02139

Last Updated 09/27/2022 09:02 AM
Project Title

Tobin Montessori and Vassal Lane Upper schools construction project - Sub

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02138   (Middlesex County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $77,958,619 [brand] Estimate
Plans Available from Agency's Affiliate - 03/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Cost $240,000,000 For Filed Subcontractors for Tobin Montessori & Vassal Lane Upper schools construction project. DCAMM Filed Sub Bid Categories: Masonry, Miscellaneous Metals, Waterproofing, Dampproofing, and Caulking, Roofing and Flashing, Glass and Glazing, Tile, Acoustical Tile, Resilient Floor, Terrazzo, Painting, Elevators, Fire Protection, Plumbing, Heating Ventilation and Air Conditioning, Electrical. DCAMM Filed Sub Bid Categories: Masonry, Miscellaneous Metals, Waterproofing, Dampproofing, and Caulking, Roofing and Flashing, Glass and Glazing, Tile, Acoustical Tile, Resilient Floor, Terrazzo, Painting, Elevators, Fire Protection, Plumbing, Heating Ventilation and Air Conditioning, Electrical. Bid Result ROOFING AND FLASHING Greenwood Industries, Inc. -$4,796,000.00 WATERPROOFING, DAMPPROOFING, AND CAULKING Beacon Waterproofing & Restoration -$3,477,007.00 MISC. & ORNAMENTAL IRON United Steel, Inc - $3,149,000.00 ACOUSTICAL TILE Cheviot Corporation - $3,071,766.00 TILE HIGH POINT INTERIORS INC - $1,855,110.00 TERRAZZO Roman Mosaic & Tile Company - $873,879.00 RESILIENT FLOORS Capital Carpet & Flooring, Inc - $1,648,757.00 GLASS AND GLAZING A & A Window Products, Inc. - $521,100.00 PAINTING O'Byrne Painting and Contracting Inc - $892,000.00 PLUMBING Grasseschi Plumbing & Heating, Inc. - $7,292,000.00 HVAC General Mechanical Contractors, Inc. - $20,473,000.00 ELECTRICAL WORK Wayne J. Griffin Electric Inc. - $19,800,000.00 ELEVATORS Delta Beckwith Elevator - $805,000.00 MASONRY WORK Costa Brothers Masonry, Inc. - $5,531,000.00 FIRE PROTECTION Cogswell Sprinkler Co. - $3,773,000.00

Details

350,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents