Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Northwest Hangar Taxilane Construction at Friday Harbor Airport
Infrastructure
Bidding
$1,500,000 CJ est. value
Friday Harbor, WA 98250

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Russell Creek Project
Alteration
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Ready Mix Concrete
Alteration
Results
$219,175 est. value
Tacoma, WA

West Canal Concrete Panel 2022 Replacement
Alteration
Post-Bid
Quincy, WA 98848

Last Updated 03/23/2023 05:07 PM
Project Title

Construction of South Summit Street Improvements Project

Physical Address View project details and contacts
City, State (County) Colville, WA 99114   (Stevens County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to South Summit Street from Ivy Avenue to Birch Avenue / Miner Street and includes approximately 9,110 square yards of full depth reclamation with cement treated base, 1,600 tons of asphalt paving, 4,100 linear feet of concrete curb and gutter, 2,160 square yards of concrete sidewalk and driveways, rectangular rapid flashing beacon, 1,575 linear feet of 12-inch water main, 175 linear feet of 8-inch water main, 17 service connections, 2 fire hydrants, pavement markings, storm drainage improvements, erosion and sediment control, traffic control and other miscellaneous work. A certified or bank cashier's check in the amount of five percent (5%) of the bid amount, payable to the City of Colville, or bid bond executed by a licensed bonding company is required with each bid, subject to the conditions provided for in the bid procedures and conditions. No bidder may withdraw a bid within thirty (30) days after the actual date of the opening thereof. A performance and payment bond in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Attorneys- in-fact who sign bid bond and contract bonds must file with each bond a certified and effective dated copy of their power of attorney. Estimated Cost of Project: $1,500,000 - $1,600,000

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents