Similar Projects
Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Willard Road Stormwater Improvements Near Springfield/Branson Regional Airport - 20-0024 - City of Springfield
Infrastructure
Conception
$320,000 CJ est. value
Springfield, MO 65803

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Design
$28,000,000 CJ est. value
Springfield, MO 65803

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Resurface, Safety and ADA Improvement
Infrastructure
Bidding
$15,000,000 CJ est. value
Willard, MO 65770

Grading and Paving
Infrastructure
Bidding
$25,000,000 CJ est. value
Willard, MO 65770

Electric Line Construction - Pole Maintenance - Release
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Springfield, MO 65806

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

OTC Esports Classroom and Lobby
Renovation
Post-Bid
Springfield, MO 65802

Jordan Valley Innovation Center - Building 4 - 1st and 2nd Floor Tenant Infills
Renovation
Results
$3,877,879 est. value
Springfield, MO 65806

Construction of Building 6, Jordan Valley Innovation Center
New Construction
Results
$4,000,000 est. value
Springfield, MO 65806

Drury University Enterprise Center
New Construction - 56,700 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Springfield, MO 65802

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

Last Updated 11/14/2022 05:09 PM
Project Title

Temple Hall Addition & Renovation - General Trades Package

Physical Address View project details and contacts
City, State (County) Springfield, MO 65897   (Greene County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $55,400,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a +/-78,000 GBASF, four story (plus a basement) addition that will house research laboratories, student space, and offices. The addition will allow Temple Hall to have a more substantial, more welcoming presence to the most prominent campus adjacent to Hammons Fountain. Temple Hall has eight entrances, creating safety concerns. This new addition should help pull students into the building with a new main entry and minimal secondary entrances. The Whiting-Turner Contracting Co. is soliciting bids from interested bidders including certified Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Service-Disabled Veteran Enterprises (SDVE) subcontractors to provide bids for the Missouri State University Temple Hall project in Springfield, MO. This project is supported by the Health Resources and Services Administration (HRSA) of the U.S. Department of Health and Human Services (HHS) as part of an award totaling $30M with 0% financed with non-governmental sources. The contents are those of the author(s) and do not necessarily represent the official views of, nor an endorsement, by HRSA, HHS, or the U.S. Government. For more information, please visit HRSA.gov. The following bid solicitations for construction services of select scopes of work will include the following contracts: General Trades, Demolition, Structural Concrete, Steel, Waterproofing, Fireproofing, Roofing, Elevator, Earthwork & Site Utilities, Deep Foundations, and Shoring Should bidders have any questions, they should contact Matt Jones at (785) 493-5407 or matt.jones@whiting-turner.com for further information. *Please note that the listed value reflects the entire scope of work.

Details

4 Stories, 1 Story Below Grade, 78,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents