Similar Projects
U Of C Arts Lawn Phase 2
Alteration - 40,700 SF
Design
Chicago, IL 60637

Citywide Irrigation System, Maintenance, Repair, Design and Installation Group A: North Region; Group B: Central Region; Group C: South Region, and Group D: Lake Shore Drive
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Chicago, IL 60604

Citywide Irrigation System, Maintenance, Repair, Design and Installation Group A: North Region; Group B: Central Region; Group C: South Region, and Group D: Lake Shore Drive
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Chicago, IL 60604

Expressway Mowing North
Post-Bid

Tree Planting 2021
Post-Bid
Buffalo Grove, IL

Parkway Restoration
Results
Elk Grove Village, IL

Tree Removal
Infrastructure
Results

2023 Downtown Landscape Maintenance
Term Contract
Sub-Bidding
Des Plaines, IL 60016

Landscape Maintenance Services
Post-Bid
Buffalo Grove, IL

District Wide On-Call Tree Removal
Infrastructure
Results

RR-21-4581 - Landscape Planting Improvements
Post-Bid

Ecological Restoration
Infrastructure
Results

Campus-Wide Turf and Landscape Bed Care Program
Term Contract
Post-Bid
Chicago, IL

Richton Park Town Center Stormwater Improvements - Stage 1
Infrastructure
Results
$761,000 est. value
Richton Park, IL

Landscape Services
Alteration
Post-Bid
Palatine, IL

Last Updated 09/27/2022 08:18 AM
Project Title

Planting of Various Landscaping Features Within the 1-90 and 1-290 Expressway Corridors, Installation

Physical Address View project details and contacts
City, State (County) Chicago, IL 60604   (Cook County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $10,509,138 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

(1.39-Mile) Planting of various landscaping features within the 1-90 and 1-290 expressway corridors, installation of various aesthetics features as well as creation of green spaces at selected locations to enhance the overall corridor. Region 1 District 1 Federal Project # N/A County(s) Cook Key Route(s) FAI 94 FAI 90 Marked Route(s) I-90/94 Section(s) 2014-012LS State Job #(s) C-91-278-14 PPS #(s) 1-78691-1660 Completion Date: June 01, 2025 Plus 10 Working Days Questions not accepted as of June 07, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 179 - Planting of Various Landscaping Features Within the 1-90 and 1-290 Expressway Corridors, Installation

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents