Similar Projects
Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Conception
$65,000,000 est. value
Homewood, AL

PPE Storage Warehouse
New Construction, Infrastructure
Design
$900,000 CJ est. value
Slocomb, AL 36375

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Bidding
$6,770,759 CJ est. value
Athens, AL 35613

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Bidding
$6,770,759 CJ est. value
Athens, AL 35613

Meter Parts Bid
Term Contract
Sub-Bidding
Alabaster, AL 35007

Deep Well Transmission Main
New Construction
Post-Bid
Hope Hull, AL 36043

Water and/or Wastewater Utility Services for FCI Aliceville
Post-Bid
Aliceville, AL

2021 Water Supply Improvements - Elevated Water Storage Tank Project
Results
Moundville, AL

AMI 2021 Meter Change-Out Project Phase 1
Results
Tuscaloosa, AL

Rural King - Building and Site Work
New Construction, Infrastructure - 86,439 SF
Construction
Albertville, AL

Chapel Heights
New Construction, Infrastructure
Pending Verification
Auburn, AL

ArchCo North Dean Road
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Auburn, AL 36830

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

Last Updated 08/15/2022 09:04 AM
Project Title

Water System Improvements Elevated Water Storage Tank

Physical Address View project details and contacts
City, State (County) Union Springs, AL 36089   (Bullock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,580,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Generally, the subsurface investigation indicated conditions which should be compatible with the planned tank construction provided the construction is completed in accordance with the recommendations which follow in this report. Please note that our recommendations are site specific and may not be suitable for other types of structures or other locations. Three soil test bores were completed to evaluate the subsurface conditions. Beneath sandy and silty sandy topsoil, the test bores penetrated in-situ earth described as non-cohesive silty sand and cohesive clayey sand, silty clayey sand, and plastic clay. The predominate sand earth is of marginal to good drainage classification. The predominate clay earth is of a poor drainage classification. The test bores indicated low to moderate soil strengths and consolidation characteristics which are not compatible with the use of shallow spread foundations. The planned tank should be supported on a deep foundation system. Alternately, a ground modification system such as Geopiers and shallow foundations maybe used for the tank support. Proposed Total DBE/MBE Participation Goal: 2.5% Proposed Total WBE Participation: Goal: 3.0% The Project consists of constructing a 250,000-gallon steel multi-column elevated water storage tank and necessary appurtenances The owner reserves the right to waive any informalities and reject any or all bids. Bid security shall be furnished in accordance with the Instruction to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders. Contract Time: 240 days Liquidated Damages: $500/day

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents