Similar Projects
Calas Park And Foisia Park Roof Repair - PW1416
Renovation, Alteration
Conception
$492,495 est. value
Carson, CA

Contractor - FY22 Angeles National Forest Roofing Project
Alteration
Design
$700,000 est. value
San Fernando, CA 91342

2023 District Office 1 Superintendent Roofing Project
Term Contract
Design
$200,000 CJ est. value
Pico Rivera, CA 90660

Roof Replacement At Albert O. Little Community Center
Renovation
Sub-Bidding
$600,000 CJ est. value
Artesia, CA 90701

6946 Van Nuys Roof Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Los Angeles, CA 91405

Roof Replacement, Art Center, Building 1A
Term Contract
Post-Bid
$490,000 est. value
CA

Reservoir No. 7 Roof Replacement
Alteration
Post-Bid
$600,000 est. value
La Canada Flintridge, CA 91011

Roof Repair and Replacement Services
Alteration
Results
CA

Roof Repair and Replacement Services
Infrastructure
Results
$500,000 est. value
Los Angeles, CA 90040

Roofing Replacement and Restoration at Various City Facilities
Renovation
Sub-Bidding
$400,000 CJ est. value
Glendale, CA 91206

Tower Roof Repair/Maintenance
Alteration
Post-Bid
Long Beach, CA 90815

Corporate Yard Roof Replacement
Alteration
Results
$200,000 est. value
Cerritos, CA 90703

Deferred Maintenance Fy21-22 Co-gen Roof Renovation
Renovation
Sub-Bidding
$400,000 CJ est. value
Los Angeles, CA 90095

Operations and Storage Facilities Phase III Construction of New Roof Structure over Existing Fish Tanks Platform
Renovation
Post-Bid
$268,380 CJ est. value
Culver City, CA 90230

Roof Replacement - Agoura High, Bay Laurel Elementary, Round Meadow Elementary Schools
Alteration
Results
$585,000 est. value
Agoura Hills, Calabasas, Hidden Hills, CA 91301

Last Updated 07/26/2023 09:35 AM
Project Title

Firebaugh High School Roofing at Firebaugh Hs, Gym, Cafeteria and Portables Project

Physical Address View project details and contacts
City, State (County) Lynwood, CA 90262   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $766,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior Roofing and Sealing. It is the intent of this contract to provide a fully finished exterior upgrade to all buildings on the existing Marco Antonio Firebaugh High School campus at the Lynwood Unified School District. The attached photographs and specifications are intended to give a general representation of the exterior elements of the buildings only and to give the contractor a basic understanding of the overall scope. Question Deadline 06/26/2023 at 4:00 PM PT Each Bid Proposal shall be accompanied by Bid Security in the form of: (i) a certified or cashiers check made payable to the District or (ii) a Bid Bond, in the form and content included with the Contract Documents in an amount equal to Ten Percent (10%) NO Mandatory Job Walk is required. Exterior Roofing and Sealing. It is the intent of this contract to provide a fully finished exterior upgrade to all buildings on the existing Marco Antonio Firebaugh High School campus at the Lynwood Unified School District. The attached photographs and specifications are intended to give a general representation of the exterior elements of the buildings only and to give the contractor a basic understanding of the overall scope. Firebaugh High School Roofing at Firebaugh HS, Gym, Cafeteria, (Encapsulate), and Portables (Temp Fix) Project BID# 25MAY23-PM Page | 7 1.12. Remove all signage including door and ada signage and reinstall upon completion of finish work with vandal proof screws. 1.13. Re-nail all exposed wood siding where nails are protruding, patch and repair holes prior to refinishing at portables. 1.14. Where existing wood sills occur at windows, the contractor shall completely strip, fill in and repair damaged surfaces and refinish. Del Terra crossed off (keep or delete) 1.9. Surface preparation and re-finishing of all portable building walls, trim, etc. 1.3. Surface preparation of emu walls to receive rainguard products as outlined in specifications. 1.6. Aluminum framed windows and frames are not included in the scope of work including the storefronts. 1.4. Preparation and re-finishing of all existing roof edge flashing/coping. 1.8. Preparation at building foundations against landscaped areas to prepare for a complete water sealer coverage. 1.2. Prepare all painted metallic elements to receive high performance architectural grade paint. 1.7. Preparation and re-finishing of all doors, frames and doors (interior, exterior, strike and hinge sides), door hardware excluded. 1.1. Surface preparation and re-finishing of all exterior plaster and decorative metal frames mounted to emu, plaster soffits, columns, fascia, gutters, downspouts, painted surface mounted conduit, painted data and electrical boxes etc. with a new paint system. Preparation and re-finishing of all exposed metal columns, handrails, guardrails, stair ledgers, downspouts, brackets, decorative metal elements, etc. galvanized metal handrails/guardrails remain unpainted Aluminum framed windows and frames are not included in the scope of work including the storefronts. 1.4. Preparation and re-finishing of all existing roof edge flashing/coping. 1.8. Preparation at building foundations against landscaped areas to prepare for a complete water sealer coverage. 1.2. Prepare all painted metallic elements to receive high performance architectural grade paint. 1.7. Preparation and re-finishing of all doors, frames and doors (interior, exterior, strike and hinge sides), door hardware excluded.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents