Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

2022 Coatings Program
Infrastructure
Design
$40,000 CJ est. value
Marietta, GA 30060

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
Kennesaw, GA 30144

Logan Road Sidewalk Contract
Infrastructure
Bidding
$200,000 CJ est. value
Acworth, GA 30101

Logan Road Sidewalk Contract
Infrastructure
Bidding
$200,000 CJ est. value
Acworth, GA 30101

Replace Generator for Facility 5, 805, 2127 and 2174
Renovation, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Marietta, GA 30060

Dekalb Avenue Safety Improvements
Post-Bid
GA

Truck Bay Asphalt Repaving Project at Marietta Power and Water Warehouse
Infrastructure
Post-Bid
Marietta, GA 30060

Cameron Springs Repairs and Improvements Project
Results
Powder Springs, GA

T32-D7-PCC-I-75NB-115725
Results
GA

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Pending Verification
$48,000,000 CJ est. value
Powder Springs, GA 30127

(IDIQ) Contract for Airfield Rubber Removal and Maintain Markings on the Airfield, Roads and Parking Lots
Term Contract
Design
$5,000,000 CJ est. value
Marietta, GA 30060

RFQ Construction Manager at Risk - Interdisciplinary STEM Building
New Construction, Infrastructure - 100,000 SF
Bidding
$45,000,000 CJ est. value
Marietta, GA 30060

Last Updated 08/12/2022 03:01 PM
Project Title

Windy Hill Road ADA Upgrades Project

Physical Address View project details and contacts
City, State (County) Smyrna, GA 30080   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $591,440 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of upgrading ada ramps, sidewalk panels, and curb and gutter along a portion of the windy hill road corridor from austell road to benson poole road. Project duration: the time allowed for performance of the project will be 180 days from issuance of notice to proceed. Disadvantaged business enterprise (dbe) participation and small business participation in all dot contracts is encouraged. The cobb county board of commissioners reserves the right to reject all bids and waive any formalities. Contractor must meet the current bid requirements of the Georgia Department of Transportation. Contractor and their subcontractors are required to be in compliance with the "Georgia Security and Immigration Compliance Act." Cobb County will affirmatively comply with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21 Nondiscrimination Act(s). Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents