Similar Projects
Dewatering and Drying Facility Standpipe Installation
New Construction
Bidding
Milwaukee, WI 53207

Jones Island Water Reclamation Facility Primary Clarifiers Drive Improvements
Renovation
Bidding
Milwaukee, WI 53207

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

2021 WWTF Upgrade
Post-Bid
Merrillan, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

Tunnel 271 Piping Replacement and Structural Repairs
Renovation
Post-Bid
Milwaukee, WI 53207

Last Updated 08/10/2021 10:33 AM
Project Title

CSTP 5 Improvements

Physical Address View project details and contacts
City, State (County) Superior, WI   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CSTP 5 is a combined sewer treatment plant located in the South end of Superior, WI. The project generally consists of: asphalt liner restoration, Archimedes style screw pump replacements, new asphalt liner underdrain system, new gravity dewatering pipe, and new sludge dewatering slab.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents