Similar Projects
I-59 Widening
Infrastructure
Conception
Less than $50,000,000 est. value
Trussville, AL 35173

Bell Hill Road Widening- County of Jefferson
Infrastructure
Conception
$6,000,000 to $8,000,000 est. value
Bessemer, AL 35021

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

STAYAPT Suites /Bessemer
New Construction, Infrastructure - 39,601 SF
Bidding
$6,000,000 CJ est. value
Bessemer, AL 35022

Bridge Rail Rehabilitation Airport Road - Rebid
Infrastructure
Bidding
$1,500,000 CJ est. value
Birmingham, AL 35217

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

Homewood Public Library Parking Lot Paving
Infrastructure
Post-Bid
Homewood, AL 35209

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

Hanover Circle Pavement Replacement
Infrastructure
Results
Birmingham, AL

Alamo Drafthouse Cinema
New Construction, Infrastructure - 50,000 SF
Construction
$10,000,000 CJ est. value
Birmingham, AL 35233

CenterState Logistics Park One
New Construction, Infrastructure - 1,000,000 SF
Construction
$24,300,000 CJ est. value
Birmingham, AL 35207

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

Douglas Commons
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Hoover, AL 35226

Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

Last Updated 11/22/2022 07:37 AM
Project Title

Maintenance Bridge Painting and Repair

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,234,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Jefferson Maintenance Bridge Painting and Repair on the Alford Avenue Bridge over I-65 at Exit 254 (Site 1) and the 25th Street Ensley Bridge over I-20/I-59 (MP 120.500) (Site 2) in Birminghan The Bracket Estimate on this project is from $706,041 to $862,939 . Contract Time: 45 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 038 - Maintenance Bridge Painting and Repair *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents