Similar Projects
Last Updated | 11/30/2021 12:28 PM |
Project Title | High School Driveway Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Orange, TX 77632 (Orange County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project scope for the project includes but is not limited to: 1. Install SWPPP 2. Excavate and regrade ditch 3. Remove existing concrete, asphalt road and base 4. Treat subgrade with lime 5. Install Tensar BX1200 Geogrid per manufacturer recommendations 6. Furnish, place, shape and compact new limestone base 7. Place new hot mix asphaltic concrete surface 8. Seed disturbed areas 9. Final site cleanup. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |