Similar Projects
Gravesite Expansion Fort McPherson National Cemetery Maxwell
Addition, Infrastructure, Alteration
Design
$2,000,000 to $5,000,000 est. value
Maxwell, NE 69151

Federal Funding Airport - Blair Municipal Airport
Alteration
Design
$295,000 est. value
Blair, NE 68008

Hydrovac Excavation Services
Infrastructure
Bidding
Lincoln, NE

Directional Boring Services
Infrastructure
Bidding
Lincoln, NE

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

2021 Cemetery North Addition - Phase I
Addition, Infrastructure
Results
Kearney, NE

Fort Robinson Horse Barn Foundation Repair
Infrastructure
Bidding
$300,000 est. value
Crawford, NE 69339

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 3 On-Call Util Location Service 2019 D3 District wide ER Event
Infrastructure
Results
Less than $5,000,000 est. value

Soil Purchasing, Excavating and Hauling
Infrastructure
Post-Bid
Doniphan, NE

District 6 on-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Site Grading (Albion 115kV Substation)
Infrastructure
Post-Bid
$40,000 est. value
Albion, NE

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Reported 07/15/2022 12:00 AM
Project Title

New Wastewater Treatment Plant - Contract 1 Site Pre-Grading

Physical Address View project details and contacts
City, State (County) Plattsmouth, NE   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of pre-grading of the New Wastewater Treatment Plant site and includes storm sewer installation and temporary drainage piping for the proposed equalization basin and, erosion control and seeding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents