Similar Projects
Dallas Medical Research Park
New Construction
Conception
Dallas, TX 75235

South Dallas County Dialysis
Build-Out - 10,760 SF
Design
$1,750,000 est. value
Dallas, TX 75224

Ambulatory Surgery Center
Renovation - 5,700 SF
Design
Dallas, TX 75228

Cliffview Crossing
New Construction - 17,522 SF
Post-Bid
$1,600,000 est. value
Dallas, TX 75224

Z2da--Renovate Medical Office Building (Mob) Halls and Walls Garland, Texas 75402
Renovation
Post-Bid
Garland, TX

NA3.106 110 Office Renovation
Renovation
Results
Dallas, TX 75390

Gastroenterology Medical Offices
Build-Out
Construction
Irving, TX 75039

The Magdalen House
Renovation
Construction
$1,000,000 est. value
Dallas, TX 75246

Texas Health Urgent Care
Renovation
Pending Verification
$510,000 est. value
Addison, TX 75001

Y1DA--Expand Dallas Specialty Primary Care Clinic 549-152 / Grand Prairie, TX
New Construction, Renovation
Design
Dallas, Grand Prairie, TX 75051

Z2da--Renovate Mob Halls and Walls (Va-21-00007672) Garland VAMC Outpatient Clinic Garland, Texas
Renovation
Post-Bid
$2,000,000 to $5,000,000 est. value
Garland, TX 75042

St. Paul Women's Center
New Construction
Construction
Dallas, TX 75237

White Rock Orthodontics
Build-Out - 2,920 SF
Design
$350,000 est. value
Dallas, TX 75218

Rowlett Dental Offices
New Construction - 6,404 SF
Construction
$350,000 est. value
Rowlett, TX 75088

AccuHealth Medspa
Build-Out - 6,500 SF
Design
Richardson, TX 75080

Reported 01/25/2020 12:00 AM
Project Title

Y--Expand The Dallas Specialty and Primary Care Clinic 549-152/ Grand Prairie, TX

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75071   (Dallas County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is for contractor to provide design and construction of the legal removal of hazardous materials as identified in the evaluation report, geotechnical report, verify that the current property survey is accurate, job trailer(s) with power, setting up and securing the staging area and the subcontractor parking area, and all design related elements / phasing as put forth by his A/E design team. New work will include but not be limited to the following: a new structural system that ties back into the existing system - The new system will include a new concrete foundation, new structural steel / concrete columns, new precast concrete parapets (to match the existing), new membrane roof system including roof drains, overflow drains, lighting protection, stainless steel flashing and filling in the existing courtyard opening in the roof. All interior wayfinding signage shall be provided and installed by the General contractor. A new interior roof ladder / hatch is to be provided in the area of the enclosed loading dock. In addition, new mechanical / electrical / plumbing / fire sprinkler and life safety systems and Information Technology systems will be required. New security fencing, bollards, blast resistant glass / tempered glass etc. will be required to meet the minimum requirements for Force Protection as established by the Veterans Affairs (VA). The existing building is located at 2737 Sherman Road in Grand Prairie, Texas. It is on a 5.58-acre site and the single-story 22,745 square foot building is constructed of brick and concrete (the SF does not include the basement space). The building has a partial full height mechanical basement. The building was constructed in 1972 and the interior was remodeled in 2008. The interior of the building has a 2-hour fire wall (running east to west) and the southern side of the building is currently occupied. The building does not have a fire sprinkler system. Please note that the building will remain occupied during the anticipated multiple phases of construction. A portion of the building is served by three Chilled Water Multi-Zone Air Handling Units (AHUs, located in the crawl space of the building), nine Chilled Water Fan Coil Units, and FCUs (located within and serving the perimeter). Heating is provided by Electric Heat Strips at each zone. The existing Chilled Water System consists of one 70-ton Air Cooled Chiller is located on the West end of the building one Primary pump located on the underside of the chiller, and two nonoperational secondary pumps are in the lower portion of the Mechanical Room. Existing Building Controls are pneumatic. At the time of observation there was an abandoned non-operational Split system chiller located in the lower level of the engineering space along with the Electrical Switch Board. The remote condensing unit for the chiller is located to the rear of the building (West side across drive area next to Main Transformer.) The existing air handling units are in the crawl space. Most of the systems are constant volume multi-zone systems with electric re-heat temperature control. No control or balancing valves were found on the units, as such the only means of balancing is to throttle the system with isolation valves. In addition, there are some single zone systems with the same air temperature controls that are in the crawl space. On the south side of the building there are several fan coils on the exterior wall zones located in the plenum. The existing electrical power distribution is a 2,000A 208Y/120V 3-phase 4-wire system. The main switch board is a four section 2,000 amp with ground fault protection located in the lower area of the mechanical room. Current distribution is set up to favor the separation of the North and South sides of the building allowing for the occupation of the southern part the building while the northern portion is under construction. This does not guarantee the complete separation of the two sides as there may be single circuits that cross where the new 2-hour wall. Any circuits that cross the 2-hr construction barrier that need to remain in service shall be relocated to the active panels on the south side of the building. Circuits fed from the south side crossing the barrier shall be abandoned in place and disconnected from the servicing panels. The Switch Board is in the mechanical room on the west side of the building and appeared to be original to the building. The switch board has been tested and the necessary repairs required to keep in service during construction have been completed. It is anticipated that this equipment will adequately serve the south half of the building during the construction phase. The building is serviced by an existing 3 domestic water service. The main enters the building on the east side in the crawl space through a new Double Check Backflow Preventer. The main service branches and serves the building through a north and south side main and serves the building from under floor. This main service will remain in service during construction. The existing Sanitary system is satisfactory on the south side of the building and able to be used during the construction period with minor repairs. The existing sanitary main is routed on the east side of the building. Existing plumbing fixtures are adequate to serve through the construction period. The existing ejector pump shall be evaluated for required repairs. Sanitary and water lines/systems will be removed as construction progresses. More information will be provided at the solicitation phase.

Details

1 Medical Office/Outpatient, 22,745 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents