Similar Projects
Wooten Farm Residential Development
New Construction, Infrastructure
Conception
$65,400,000 CJ est. value
Winston-Salem, NC 27284

Wooten Farm Residential Development
New Construction, Infrastructure
Conception
$65,400,000 CJ est. value
Winston-Salem, NC 27284

Loader Acres
New Construction
Design
Clemmons, NC 27103

Old Mill Subdivision
New Construction
Design
Clemmons, NC 27012

Town of Lewisville, Williams Rd Gateway Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewisville, NC 27023

Town of Lewisville, Williams Rd Gateway Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewisville, NC 27023

Grading, Drainage, Paving on SR 4000
Infrastructure
Results
NC

Muddy Creek Minor Plant Improvements
Renovation, Infrastructure
Results
$1,074,200 CJ est. value
Winston Salem, NC 27127

Ardmore Commons
New Construction
Construction
Winston-Salem, NC 27103

Gatehouse Terrace
New Construction
Construction
Winston-Salem, NC 27127

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

Rosewood Place
New Construction, Infrastructure
Pending Verification
$9,800,000 CJ est. value
Winston Salem, NC 27103

Tabor Ranch Road Subdivision
New Construction
Conception
$25,100,000 est. value
Winston-Salem, NC 27101

Metropolitan Village
New Construction - 39,810 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27101

Paving of Certain Village Streets
Infrastructure
Post-Bid
Clemmons, NC

Last Updated 12/02/2022 10:31 AM
Project Title

Long Creek Village North Phase 1

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27045   (Forsyth County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $34,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 10 townhouse buildings on 25.69 acres on the south side of Mizpah Church Road, across from Ridge Bluff Drive. Scope details have not been released. As of December 2, 2022 the project is in planning stage. A building permit has not been submitted to the City of Winston Salem. The city county Planning Board approved a rezoning request March 11, 2021. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction. 2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents