Similar Projects
Taylors Creek Extension
Infrastructure
Bidding
Hinesville, GA

Water System Improvement
Infrastructure
Bidding
Ludowici, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Westside Business Park Infrastructure Expansion Phase 3
Post-Bid
Bemiss, GA 31602

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

2019 CDBG Water System Improvements
Results
Milan, GA 31060

2021 Water Service Line Replacement
Infrastructure
Bidding
Stockbridge, GA

Construction of the Uchee Creek Campground Northwest Loop Water Main
Post-Bid
Columbus, GA 31901

FY 2019 CDBG Phase III Water System Improvements
Results
Less than $700,000 est. value
Edison, GA 39846

Waterline Extension - Crestview Drive and Walkabout Creek Road
Infrastructure
Bidding
$100,000 est. value
Morganton, GA 30560

Automated Metering Infrastructure
Post-Bid
Temple, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Fire Hydrant Testing
Infrastructure
Bidding
Mountain Park, GA

2021 City Wide Meter Project
Post-Bid
Baxley, GA

Annual Contract Installation of Water/Sewer Lines
Term Contract
Results
Less than $8,355,125 est. value
Calhoun, GA 30701

Last Updated 04/27/2022 10:55 AM
Project Title

Water Meter Replacement

Physical Address View project details and contacts
City, State (County) Twin City, GA   (Emanuel County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Purchase replacement and GPS location of approximately 724 water meters and appurtenances, provide drive-by data collection system, relocate water meters, replace meter box and lids as necessary. Time allotted for installation is 90 consecutive calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents