Similar Projects
Recreation Center Drainage and Tennis Center Court Improvements
Bidding
Orange Beach, AL 36561

Drainage Improvements on Fernwood Drive West
Bidding
Bay Minette, AL 36507

Fels Av/George St Drainage Improvment
Post-Bid
Fairhope, AL

Magnolia Springs Pavement and Drainage Rehab Project
Post-Bid
Magnolia Springs, AL

Erosion Control and Stabilization of Rock Creek
Results
Fairhope, AL

Patrician Drive Drainage Improvements
Results
Spanish Fort, AL

New Saltwater Drainline at Claude Peteet Mariculture Center Gulf Shores
Post-Bid
Gulf Shores, AL

Magnolia Springs Pavement and Drainage Rehabilitation Project
Results
Magnolia Springs, AL

2019- N-Montclair Loop Ditch Stabilization
Post-Bid
Daphne, AL

Art Center Shoreline Stabilization and Boardwalk
Results
Less than $64,727 est. value
Orange Beach, AL

Waites Lane and Sara Avenue Drainage Improvement
Post-Bid
$100,000 to $250,000 est. value
Spanish Fort, AL

Concrete Pipe
Term Contract
Results
Daphne, AL

Lackawanna Drainage Improvement
Post-Bid
$150,000 to $475,000 est. value
Spanish Fort, AL

Provision of Erosion Control Materials
Results
AL

New Substation Site Work and Retaining Wall at Nichols Avenue and Young Street
Post-Bid
Fairhope, AL 36532

Last Updated 12/03/2018 09:30 AM
Project Title

Storm Drainage Improvements

Physical Address View project details and contacts
City, State (County) Elberta, AL   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Storm Drainage Improvements project consists of the replacement of existing culverts with 428 LF of various sizes of RCP culverts, pipe backfill, pavement replacement, erosion control items, and associated miscellaneous items. An additive alternate is included for additional street resurfacing at the culvert replacement locations.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents