Similar Projects
Roadwork Spring 2021
Results
Bernard, ME

On Call Maintenance Paving
Results

Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements
Results
Blue Hill, ME 04614

(LCP) Light Capital Paving
Results
Less than $1,779,000 est. value
Amherst, Clifton, Ellsworth, Gouldsboro, Jonesboro, Mariaville, Milbridge, Otis, Sorrento, Steuben, Sullivan, ME

On Call Maintenance Paving/Located in Regions 1-5
Results

(LCP) Light Capital Paving
Results
Bar Harbor, Columbia, Ellsworth, Gouldsboro, Hancock, Lamoine, Milbridge, Mount Desert, Orland, Southwest Harbor, Tremont, Trenton, ME 04605

On Call Milling Machines and Grinders
Results

(LCP) Light Capital Paving And Maintenance Lot Paving
Results
Brooksville, Monroe, Prospect, Searsport, Sedgwick, Stockton Springs, Swanville, Winterport, ME 04986

Hot Mix Asphalt Overlay with Safety Improvements
Results
ME

2020 Pavement
Results
Bucksport, ME

On Call Milling Machines and Grinders
Results

Paving
Bidding
Hancock, ME

Crack Sealing and Crack Repair
Results
Blue Hill, Dover Foxcroft, Orland, Sebec, ME 04614

Gravel Road Construction
Results

(LCP) Light Capital Paving
Results
Less than $1,249,000 est. value

Last Updated 04/08/2021 02:43 AM
Project Title

Pavement Milling, Hot Mix Asphalt Overlay, Cyclical Pavement Resurfacing, with Drainage and Safety Improvements

Physical Address View project details and contacts
City, State (County) Blue Hill, Sedgwick, ME   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,972,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Hancock County: Project 20817.00 is on Route 15 in Sedgwick beginning 0.24 of a mile north of the Deer Isle town line and extending north 8.26 miles. Project 20900.00 is on Route 15 in Blue Hill beginning 0.05 of a mile south of Grindleville Road and extending north 1.49 miles. Project 21845.00 is on Route 15 in Blue Hill beginning 0.10 of a mile north of Route 172 and extending north 0.27 of a mile.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents