Similar Projects
Drilling Well 5
Term Contract, Infrastructure
Bidding
Florence, AZ

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Pricing Drilling and Construction of Multiple Irrigation Wells
Post-Bid
Maricopa, AZ 85138

Valentine Well
Results
Phoenix, AZ 85027

Dry Well And Interceptor Pumping And Inspection
Results
Phoenix, AZ

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Trailer Mounted Water Pumps
Results
Phoenix, AZ 85003

Materials and Equipment for Well 21 Repair
Term Contract
Post-Bid
Luke Air Force Base, Peoria, AZ 85309

Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Results
Gilbert, AZ 85297

Sewage Lift Pump
Term Contract
Post-Bid
Phoenix, AZ 85012

Chilled Water Pump
Results
Tempe, AZ 85283

Well 9 Pumping System and Refurbishment
Term Contract
Post-Bid
Luke Air Force Base, AZ

Well and Booster Pump Equipment Maintenance Service
Results
Goodyear, AZ 85338

Construction Project Drilling and Installation of the Pulte Rio Caballo Well No.1
Infrastructure
Post-Bid
Surprise, AZ 85387

Install A third (3rd) Chiller and Replace One (1) Chilled Water Pump with two (2) Chilled Water Pumps
Results
Tempe, AZ 85284

Last Updated 10/05/2021 11:27 AM
Project Title

Well Pump and Well Booster Pump Repair/Replacement, Maricopa, AZ

Physical Address View project details and contacts
City, State (County) Maricopa, AZ 85138 (Maricopa, Pinal Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to verify Well Access Point, Casing, Piping, Wire Size, Pump size, Well Depth and Power Requirements, pump size, piping configuration, and controls for booster pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents