Similar Projects
War Memorial Pool Repair and Replacement of Tile, Grout, and Drains
Renovation
Bidding
$525,000 CJ est. value
Cambridge, MA 02138

Renovate Bathrooms, 204 North Street
Renovation
Bidding
$90,000 CJ est. value
Norfolk, MA 02056

Road materials including bituminous concrete
Term Contract
Sub-Bidding
Dunstable, MA 01827

Products and Services for FY 2024 - Washed Screened Sand, Stone and Gravel
Term Contract
Sub-Bidding
Rehoboth, MA 02769

Walkway Reconstruction
Infrastructure, Alteration
Post-Bid
Upton, MA

King Stairs - Concrete Repair
Alteration
Post-Bid
$65,000 est. value
Framingham, MA 01701

Orchard Street Water Storage Tank Rehabilitation Re-bid
Renovation
Results
$632,710 CJ est. value
Raynham, MA 02767

Repair of Concrete Beam and Ceiling Corrigan MHC
Alteration
Results
$25,000 est. value
Fall River, MA 02720

Exterior Concrete Stair Reconstruction
Infrastructure, Renovation
Construction
$210,000 CJ est. value
Dracut, MA 01826

Fire Pump Replacement At China Trade Center - General Bids
Renovation
Bidding
$320,500 CJ est. value
Boston, MA 02116

Random Crack Sealing
Infrastructure
Sub-Bidding
$150,000 CJ est. value
Danvers, MA 01923

Tower Foundation, Cape Cod Space Force Station In Bourne, MA
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Bourne, MA

Building E VCT Installation
Alteration
Results
$75,000 est. value
Fall River, MA

Crack Seal - Various locations in Medford
Infrastructure
Sub-Bidding
$105,488 CJ est. value
Medford, MA 02155

Peter Cooke Memorial Town Recreation Field Pavillion Re-Roof and Slab Replacement - General Bid
Infrastructure, Alteration
Post-Bid
$60,000 est. value
Clarksburg, MA

Last Updated 06/15/2023 02:59 PM
Project Title

Ted Plumb Stadium at Duggan Academy Athletic Complex Redevelopment Project for the Department of Capital Asset Construction

Physical Address View project details and contacts
City, State (County) Springfield, MA 01109   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,290,000 [brand] Estimate
Plans Available from Copy Center - 03/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Ted Plumb at Duggan Academy Athletic Complex Redevelopment project will include the construction of a synthetic turf field with 400m track, athletic lighting, basketball courts and associated site lighting and walkways. This IFB is subject to M.G.L. Ch. 30 39M and other state procurement statutes. MA Prevailing Wages and Federal Davis-Bacon Wages will apply to this project. The Deputy Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. The City of Springfield supports the goal of twenty percent minority and women (MWBE) participation in all contracts. The original RFI Submittals Deadline of has been extended one week to Friday, March 31, 2023 at 4:00PM. The work is estimated to cost $4,500,000.00.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents